Skip to main content

BMW i partners with Schneider on home EV charging

BMW i continues with its introduction of customer-friendly electro-mobility services in the UK, forming a partnership with Schneider Electric, which will see Schneider Electric become not only the manufacturer of the BMW i wall box, but also the recommended installer. Schneider Electric will work closely with the BMW i sales agents and customers, providing home surveys, supply and installation of the charging point, as well as offering maintenance and comprehensive support. The installation package will be
August 8, 2013 Read time: 2 mins
1731 BMW i continues with its introduction of customer-friendly electro-mobility services in the UK, forming a partnership with 729 Schneider Electric, which will see Schneider Electric become not only the manufacturer of the BMW i wall box, but also the recommended installer.
 
Schneider Electric will work closely with the BMW i sales agents and customers, providing home surveys, supply and installation of the charging point, as well as offering maintenance and comprehensive support.  The installation package will be provided by Schneider Electric but managed by BMW and can be customised to meet customers' specific requirements.
 
The BMW i wall box will allow BMW i3 owners to charge their vehicles quickly and conveniently while at home or at work, at up to 7.4kW from zero to 80 per cent within three hours and on to a full charge within four hours.  The BMW i3 is the first electric vehicle on the market to be purpose-designed to work with a specially developed home charging unit from the outset.

For more information on companies in this article

Related Content

  • Fixed or wireless communications?
    February 3, 2012
    Optelecom-NKF's Coen Hooghiemstra considers the play-offs and pay-offs involved when deciding whether to go for fixed or wireless communications solutions
  • EETS: still struggling to become reality
    December 4, 2013
    Erich Erker, Norbert Schindler, Peter Tschulik from Siemens Electronic Tolling examine the barriers to EETS deployment. Tolling in Europe was introduced to pay for the construction and operation of individual tunnels, bridges and highways and has evolved in major steps. The original manual tolling systems were highly disruptive to traffic flow and required the creation of large toll plazas, with multiple lanes and toll booths to ensure an acceptable throughput. With the introduction of Dedicated Short Range
  • Weigh in motion reduces road wear, increases toll revenue
    January 24, 2012
    IRD, Inc's Terry Bergan discusses future applications of weigh in motion technology. The application in recent years of Weigh In Motion (WIM) at tollgates has been driven by recognition of the fact that there is economic value, which can be levied, attached to Heavy Goods Vehicles (HGVs) which haul laden (and are therefore heavy) rather than empty. As wear and damage to road surfaces increases exponentially with weight, the targeting of HGVs in particular makes sense from both the economic and maintenance p
  • HeERO - harmonising e-Call across Europe
    March 1, 2013
    The second stage of the EC’s HeERO project, which aims to address some of the issues surrounding the eCall system, has just got underway. Jason Barnes reports. As the European Commission (EC)’s Har­monised eCall European Pilot (HeERO) project progresses into its second stage, ‘HeERO 2’, significant progress has already been made in addressing the technological and institutional issues relating to the pan-European deployment of an eCall system based around the new ‘112’ universal emergency telephone number.