Skip to main content

Blackpool tramway reaches five million passengers

Blackpool’s revamped tramway system is proving popular than ever, with ticket sales showing that five million journeys have been recorded so far since April 2016, building on the increases in passenger journeys since the tramway re-opened in 2012 and topping the five million passengers mark for the first time since 1994.
March 2, 2017 Read time: 1 min

Blackpool’s revamped tramway system is proving popular than ever, with ticket sales showing that five million journeys have been recorded so far since April 2016, building on the increases in passenger journeys since the tramway re-opened in 2012 and topping the five million passengers mark for the first time since 1994.

The news comes as work progresses to extend the tramway from the promenade up to Blackpool North train station.

Not only are more people using the tram network, but passenger satisfaction is also up; according to the latest figures by the Department for Transport,  96 per cent of people surveyed saying they enjoyed the experience.

The 11 mile tramway runs from Starr Gate in Blackpool up to Fleetwood Ferry, operating a service every ten minutes during the summer season.

It re-opened in 2012 following a major replacement of the track, creation of a new tram depot and arrival of 16 new Flexity2 trams. The new trams have level boarding, making them accessible for all disabled users, allowing for faster journey times and a more energy efficient service.

Related Content

  • How digital navigation is key to managing congestion
    March 24, 2023
    Satnav – not costly civil engineering projects – might point us towards better management of congested road networks, argues David Metz of University College London
  • Moxa wayside infrastructure keeps Besançon trams on track
    May 28, 2014
    To ensure reliable communication between tram and track and to enhance passenger comfort and safety on the new 14.5 kilometre tram network in the French city of Besancon, officials opted to use Moxa’s wayside infrastructure network to manage the on-board communication network for video surveillance and passenger information. The wayside infrastructure network was built as a multi-service Ethernet network using Moxa´s managed industrial Gigabit EDS-P510 Ethernet switches equipped with SFP connectors to bu
  • Shotl goes the extra mile for mobility
    March 30, 2022
    Villages and residential suburbs can be good places to live, but often lack public transport facilities. Buses tend to be infrequent and, where they exist, often require public subsidies.
  • Road space utilisation improves travel times, reduces costs
    February 1, 2012
    For major road works schemes, necessary lane closures are timed to minimise congestion, most frequently at night and on weekends when traffic is at its lightest. As a result, rigid timetables are used in planning, programming and implementing work. In the UK, to calculate the expected traffic demand through roads works, historic profiles from the loop-based MIDAS (Motorway Incident Detection Automatic Signalling) system were used. These provided a valuable indicator of anticipated traffic behaviour but were