Skip to main content

Bill introduced in US Senate to extend positive train control deadline

Four US senators have introduced the bipartisan Railroad Safety and Positive Train Control Extension Act in an effort to extend the deadline for full implementation of positive train control (PTC) on US railroads to 2020. Missouri has 4,400 miles of main rail track that are operated by 19 different railway companies. PTC is a technology designed to automatically stop or slow a train before certain collisions. The Rail Safety Improvement Act of 2008 mandates that PTC must be installed by31 December 2015. PT
March 6, 2015 Read time: 2 mins
RSSFour US senators have introduced the bipartisan Railroad Safety and Positive Train Control Extension Act in an effort to extend the deadline for full implementation of positive train control (PTC) on US railroads to 2020.

Missouri has 4,400 miles of main rail track that are operated by 19 different railway companies.

PTC is a technology designed to automatically stop or slow a train before certain collisions. The Rail Safety Improvement Act of 2008 mandates that PTC must be installed by31  December 2015. PTC is mandated on tracks that carry passenger rail and certain hazardous materials, and will cover around 60,000 tracks in total nationwide.

The bill was introduced by Missouri Senator Roy Blunt and co-sponsored by Senate Commerce Committee Chairman John Thune, Ranking Member Bill Nelson, and US Senator Claire McCaskill, who claim the delay would help ease the regulatory burden and costs for passenger and freight railroads

“We must work to do everything we can to improve train safety and accident prevention without burdening our nation’s freight and passenger rail industry," said Blunt. "Unmanageable deadlines could result in higher costs and a disruption of service. This bipartisan bill will help ease the Positive Train Control deadline to give railroads in Missouri and nationwide enough time to fully and safely implement this new technology.”

Related Content

  • September 29, 2017
    Senators set to release new legislation on self-driving car bill
    Two US Senators have announced a bipartisan agreement to remove some regulations which made it harder to deploy self-driving cars on American roads, according to a report on US political website ‘The Hill’. On 4 October a Senate committee will consider the legislation already passed by the House of representatives which would allow automakers to sell up to 25,000 vehicles in the first year they are offered and up to 100,000 if they are deemed to be as safe as cars driven by humans.
  • April 3, 2014
    Alaska Railroad to get Wabtec PTC
    Wabtec is to supply the Alaska Railroad Corporation with positive train control (PTC) equipment and services, including computer-aided dispatch and back office systems. The systems will be installed on the railroad's 525 miles of controlled track, which are used for both freight and regularly scheduled passenger service. Under the contracts, worth US$16.6 million, Wabtec will provide its interoperable electronic train management system (I-ETMS) equipment and installation of all PTC components for 54 loc
  • June 5, 2015
    ITS America applauds V2I infrastructure Act
    Regina Hopper, president and CEO of ITS America, has responded to the introduction of the Vehicle-to-Infrastructure Safety Technology Investment Flexibility Act of 2015 by US Senators Gary Peters and Roy Blunt. The Vehicle-to-Infrastructure Safety Technology Investment Flexibility Act of 2015 authorizes states to use existing surface and highway transportation funding provided by the National Highway Performance Program, the Surface Transportation Program and the Highway Safety Improvement Program to in
  • December 17, 2013
    Wabtec scoops train control contract
    Rail technology provider Wabtec Corporation has signed a US$34 million contract with Sound Transit, a commuter railroad serving the Seattle region, to design, install, test and commission a positive train control (PTC) system. Sound Transit's commuter rail line covers 82 miles and carries nearlythree3 million passengers annually. Under the contract, Wabtec will provide its interoperable electronic train management system (I-ETMS) equipment and installation for sixteen locomotives and eighteen passenger