Skip to main content

Barrier-free truck tolling for Spain's Basque region

MLFF system covers 146 lanes and has been processing 1.4 million transactions daily
By David Arminas October 11, 2024 Read time: 2 mins
Trucks on Spain's A-8 highway (© I�aki Polo | Dreamstime.com)

Kapsch TrafficCom has completed a multi-lane free-flow (MLFF) tolling system in the Bizkaia (Biscay) province of the Basque region of Spain.

The contract for the system was awarded in 2022 by Interbiak. Kapsch not only completed the installation of the system in time, but delivered an additional 10 gantries, increasing the number of gantries to 26, and total number of lanes covered to 146. Since the system went live on 1 July, it has been processing more than 1.4 million transactions daily.

The truck tolling system is installed along different sections of the A-8 towards Cantabria, the N-636 from Beasain to Durango via Kanzapar and the N-637 from Cruces to Erletxes. It includes the gantries, cameras, sensors and all associated hardware and software. Additionally, Kapsch was awarded a level 2 and 3 maintenance contract until June 2026.

As part of the innovative project, Kapsch TrafficCom also installed three roadside units that can be used for connected vehicle use cases, adding to the 25 installed units already installed in the Bizkaia C-ITS corridor. This will further expand the use cases of this smart corridor, guaranteeing safer and more efficient traffic in the region.

Kapsch said that one of the bigger challenges was the installation of the gantry at Rontegi Bridge, one of the most sensitive road sections of the Bizkaia road network. The gantry, more than 40m wide, covers four lanes in both directions, explains Javier Aguirre, managing director of Kapsch TrafficCom Spain and Portugal. “Despite the bridge having the highest traffic flow in the Bizkaia region with 180,000 vehicles daily, the installation was successfully completed in one night without closing the road,” he said.

The MLFF system is designed to improve traffic flow and reduce greenhouse gas emissions by eliminating the need for vehicles to stop at toll collection points. It is flexible and scalable, meaning it can adapt and expand its capacity without major changes. It also has redundancy built into all critical elements, enhancing its reliability and making it one of the most dependable systems of its kind on the market, according to Kapsch.

Kapsch TrafficCom is a global provider of transportation solutions with successful projects in more than 50 countries. It is based in Vienna, Austria, with subsidiaries and branches in more than 25 countries. In its 2023-24 financial year, about 4,000 employees generated revenues of €539 million.

For more information on companies in this article

Related Content

  • Kapsch preferred bidder on Ohio River Bridges toll project
    March 13, 2015
    The Indiana Finance Authority (IFA) and Ohio River Bridges Joint Board have again selected Kapsch TraffiCom to manage and maintain an all-electronic toll-collection system for the Louisville-Southern Indiana Ohio River Bridges Project. Kapsch TrafficCom was selected from among three bidders who participated in the proposal process. A joint evaluation committee, made up of officials from both Indiana and Kentucky, scored the proposals based on the best value. Kapsch TrafficCom's proposal estimate was US$41.5
  • Kapsch TrafficCom announces AUS $24 million contract with Roads and Maritime Services NSW
    October 11, 2016
    Kapsch TrafficCom Australia Pty Ltd announced at the ITS World Congress that it had reached agreement with Roads and Maritime Services (RMS) in New South Wales, for the supply of electronic transponders. Over a potential five-year period, the contract has an approximate value of AUS$24 million (15 million EUR).
  • Brazil launches BRT tender
    February 20, 2015
    The city of Sorocaba in Brazil's São Paulo state has called for bids to develop a 35 kilometre bus rapid transit (BRT) system in the city budgeted at US$47 million, according to a local government tender notice. The contract, which involves building, maintaining and operating the BRT along the city's north-south and east-west corridors for 20 years, is expected to benefit some 150,000-180,000 passengers. Studies for the project have been carried out by the Consor-Ellenco and KPMG-Proficenter consortiums. Ac
  • Mexico’s Durango-Mazatlan highway sets tunnel safety standard
    August 26, 2016
    Mauro Nogarin looks at the management of the longer tunnels on Mexico’s Durango-Mazatlan highway. In recent years the National Infrastructure Fund of Mexico has increased investment in the installation of ITS systems on selected highways to increase road safety. One such major investment is the 230km long Durango-Mazatlan highway which is 12m in width and has an average speed of 110km/h.