Skip to main content

Balfour Beatty VINCI joint venture to be awarded HS2 contracts

The long-established Balfour Beatty VINCI joint venture is to be awarded two rail contracts in the UK by High Speed 2 (HS2), worth a combined total of around US$3.3 billion (£2.5 billion). Balfour Beatty VINCI will deliver Lots N1 and N2between the Long Itchington Wood Green tunnel to the Delta Junction/Birmingham Spur and from the Delta Junction to the West Coast Main Line tie-in respectively, in a two-part design and build contract. Main construction work is scheduled to start in 2018/19, following a peri
July 17, 2017 Read time: 1 min
The long-established 3902 Balfour Beatty 5176 VINCI joint venture is to be awarded two rail contracts in the UK by High Speed 2 (HS2), worth a combined total of around US$3.3 billion (£2.5 billion).


Balfour Beatty VINCI will deliver Lots N1 and N2between the Long Itchington Wood Green tunnel to the 33 Delta Junction/Birmingham Spur and from the Delta Junction to the West Coast Main Line tie-in respectively, in a two-part design and build contract.

Main construction work is scheduled to start in 2018/19, following a period of detailed design work.

For more information on companies in this article

Related Content

  • Strabag subsidiary Züblin awarded Copenhagen metro contract
    June 11, 2014
    Strabag Danish subsidiary, Züblin is to lead a joint venture for Copenhagen’s new metro line between Østersøgade and the new Nordhavn metro station. The contract includes about two kilometres of double tube metro line connecting the ongoing Cityringen circle line project with the new North Harbour development area in the city of Copenhagen. The order has a total value of US$203 million, with Züblin’s share amounting to about US$122 million. The contract consists of the design and construction of twin TBM
  • Qatar awards first phase of New Orbital Highway
    January 13, 2014
    Qatar’s Public Works Authority (Ashghal) has awarded include the contract for the design and construction of the first 45 kilometre phase of the ambitious 180k kilometre New Orbital Highway.
  • Growing passenger numbers, fare rises for UK rail
    December 16, 2014
    According to Rail Travel, a new market report from business intelligence provider Key Note, in 2013/2014 the total value of passenger receipts for UK rail travel increased by 6.2 per cent year-on-year, and grew by 32.5 per cent over a five-year period. In addition, passenger journeys grew by 23.5 per cent over the five-year review period, with passenger kilometres travelled also growing by 17.9 per cent over the same timeframe. For the purpose of this report, the rail industry in the UK has been split in
  • Jacobs JV awarded contract for California high speed rail
    July 23, 2015
    The Jacobs Engineering Group has been awarded a contract to provide design services for the Construction Package 2-3 (CP 2-3) of the California High Speed Rail, the continuation of construction on the California high-speed rail system south towards Kern County. Jacobs is the lead designer for the Dragados-Flatiron joint venture for the design-build contract and is responsible for the infrastructure design. The California High Speed Rail is the first true high-speed rail being constructed in the United S