Skip to main content

Balfour Beatty VINCI joint venture to be awarded HS2 contracts

The long-established Balfour Beatty VINCI joint venture is to be awarded two rail contracts in the UK by High Speed 2 (HS2), worth a combined total of around US$3.3 billion (£2.5 billion). Balfour Beatty VINCI will deliver Lots N1 and N2between the Long Itchington Wood Green tunnel to the Delta Junction/Birmingham Spur and from the Delta Junction to the West Coast Main Line tie-in respectively, in a two-part design and build contract. Main construction work is scheduled to start in 2018/19, following a peri
July 17, 2017 Read time: 1 min
The long-established 3902 Balfour Beatty 5176 VINCI joint venture is to be awarded two rail contracts in the UK by High Speed 2 (HS2), worth a combined total of around US$3.3 billion (£2.5 billion).


Balfour Beatty VINCI will deliver Lots N1 and N2between the Long Itchington Wood Green tunnel to the 33 Delta Junction/Birmingham Spur and from the Delta Junction to the West Coast Main Line tie-in respectively, in a two-part design and build contract.

Main construction work is scheduled to start in 2018/19, following a period of detailed design work.

For more information on companies in this article

Related Content

  • JMT/Parsons Brinckerhoff JV to consult on Maryland bridge replacement
    July 7, 2015
    The Maryland Transportation Authority (MDTA) has selected a joint venture of Johnson, Mirmiran and Thompson (JMT) and Parsons Brinckerhoff as general engineering consultant for the replacement of the Harry W. Nice Memorial Bridge. The bridge, also known as the Potomac River Bridge, is a 1.7-mile (2.7 km), two-lane continuous truss bridge on US 301 that spans the Potomac River between Newburg in Maryland and Dahlgren in Virginia. The US$1 billion programmed budget involves replacing the existing structure
  • USDOT awards infrastructure grants to 18 projects
    September 9, 2016
    US Transportation Secretary Anthony Foxx has announced 18 infrastructure projects across the country that will receive federal grants as part of the new FASTLANE program. The grants, totalling nearly US$800 million, will be combined with other funding from federal, state, local and private sources to support US$3.6 billion in infrastructure investment in 15 states and the District of Columbia.
  • Ohio River Bridges East End crossing project opened to traffic
    December 21, 2016
    The Ohio River Bridges East End Crossing, now named the Lewis and Clark Bridge, has opened to traffic to connect SR 265 in Indiana with the Gene Snyder Freeway in Kentucky, marking the substantial completion of the $2.3 billion Louisville Southern Indiana Ohio River Bridges project, which included the Downtown Crossing, now named the Abraham Lincoln Bridge. Parsons was the lead partner in the Community Transportation Solutions joint venture (JV). The JV served as the overall project’s general engineerin
  • Highways England awards new-style framework contracts
    January 30, 2017
    Highways England has teamed up with 18 companies to help improve journeys for road users in Cumbria, North Lancashire and the North East of England. A new style framework, worth up to US$543 million (£434 million) will start on 1 April 2017. The Construction Works Framework covers 10 different specialisms of work, is split into 15 separate lots and will run for four years. The framework covers a range of activities that include renewal work to roads and bridges, and improvement schemes on the Highways