Skip to main content

Balfour Beatty VINCI joint venture to be awarded HS2 contracts

The long-established Balfour Beatty VINCI joint venture is to be awarded two rail contracts in the UK by High Speed 2 (HS2), worth a combined total of around US$3.3 billion (£2.5 billion). Balfour Beatty VINCI will deliver Lots N1 and N2between the Long Itchington Wood Green tunnel to the Delta Junction/Birmingham Spur and from the Delta Junction to the West Coast Main Line tie-in respectively, in a two-part design and build contract. Main construction work is scheduled to start in 2018/19, following a peri
July 17, 2017 Read time: 1 min
The long-established 3902 Balfour Beatty 5176 VINCI joint venture is to be awarded two rail contracts in the UK by High Speed 2 (HS2), worth a combined total of around US$3.3 billion (£2.5 billion).


Balfour Beatty VINCI will deliver Lots N1 and N2between the Long Itchington Wood Green tunnel to the 33 Delta Junction/Birmingham Spur and from the Delta Junction to the West Coast Main Line tie-in respectively, in a two-part design and build contract.

Main construction work is scheduled to start in 2018/19, following a period of detailed design work.

For more information on companies in this article

Related Content

  • Kapsch awarded Toowoomba Second Range Crossing in Queensland
    May 13, 2016
    Kapsch TrafficCom subsidiary Kapsch TrafficCom Australia is to deliver the roadside tolling system for the Toowoomba Second Range Crossing (TSRC) Project in Queensland, Australia. The contract, awarded by the State of Queensland, comprises supply and operation for 10 years of the roadside system for TSRC and is valued at around US$6.6 million (€6 million). Kapsch will deliver its latest tolling technology based on the company’s single gantry multi-lane free-flow platform and next-generation vision te
  • Egis awarded second Turkish motorway contract
    June 25, 2013
    French engineering and consulting group Egis has been selected by Turkish toll concessionaire Oyotol as its partner for the operation and maintenance of the Gebze-İzmir motorway in Turkey. The deal follows the award of the Eurasia tunnel in 2012. The Build, Operate and Transfer (BOT) project is being carried out on behalf of the Turkish General Directorate of Highways and is said to be the largest BOT project in Turkey to date. It includes 420 km of motorway (2x3 lanes) between Gebze on the North shore of
  • National funding cuts cause fragmentation of US ITS market
    February 1, 2012
    Paul Everett, Research Director with IMS Research, looks at how ITS deployment varies across the US and what this means in terms of market potential for systems manufacturers and suppliers At the end of 2010, the US will have a total resident population of close to 310 million, rising to an estimated 439 million by 2050.
  • Variable message signs continue to deliver travel information
    February 2, 2012
    Arguably the 'face' of ITS, variable message signs are far from being a passing solution