Skip to main content

Balfour Beatty secures contract extension to operate and maintain M1-A1 Link Road

Balfour Beatty, the international infrastructure group, has been awarded a US$47.5 million (£36 million) contract extension to its existing Managing Agent Contract for the M1-A1 Link Road in the UK on behalf of Connect Roads, for ultimate customer Highways England.
September 14, 2017 Read time: 1 min

Balfour Beatty, the international infrastructure group, has been awarded a US$47.5 million (£36 million) contract extension to its existing Managing Agent Contract for the M1-A1 Link Road in the UK on behalf of Connect Roads, for ultimate customer Highways England.

The extension sees Balfour Beatty continue its operations and maintenance services through to March 2026 on this 18-mile long strategic motorway between the M1 and M62 south and east of Leeds, and the A1 (M) south of Wetherby.

Works undertaken by Balfour Beatty include network management, technical inspections, routine and cyclical maintenance, asset management and lifecycle maintenance, including pavement, structures, geotechnical, highway lighting and signs, vehicle restraint and road markings.

Related Content

  • More than 3,000 GB road bridges are ‘substandard’
    March 10, 2017
    More than 3,000 council-maintained road bridges in Great Britain are substandard, according to a report by the RAC Research Foundation. Analysis of data received from 199 of the 207 local highway authorities in England, Scotland and Wales found that 3,203 structures over 1.5m in span are not fit to carry the heaviest vehicles now seen on our roads, including lorries of up to 44 tonnes. The 3,203 bridges represent about 1 in 23 of the roughly 72,000 bridges to be found on the local road network. Many o
  • Highways England announces funding to improve major motorway junction
    April 7, 2017
    Highways England has announced plans to invest total of US$3.7 million (£3 million) for major improvements to Switch Island in Merseyside, one of the north-west’s busiest motorway junctions where the M57, M58 and three A roads connect. Construction work at the junction, which is used by over 90,000 vehicles every day, is expected to start next year. The scheme is designed to improve the flow of traffic and enhance safety, following 49 collisions at the junction in the past two years. New traffic light
  • Q-Free awarded free flow toll extension in Portugal
    August 10, 2015
    Portuguese motorways operator Ascendi has awarded Q-Free a US$19 million contract for the renewal and extension of service and maintenance of several of the Ascendi multi-lane free flow toll (MLFF) concessions for a further six years. Ascendi is said to be the largest European private operator, providing automatic vehicle classification of four vehicle classes including HGVs and light passenger vehicles. The company has 128 collection points installed and processes around one million transactions per da
  • High-speed WIM moves onto the main highway
    May 24, 2016
    High-speed weigh-in-motion is starting to make its mark on both sides of the Atlantic. As a transit country the Czech Republic experiences a large number of overloaded vehicles, which greatly increase highway maintenance costs. This prompted its Transport Ministry to trial an extension of the capabilities of the existing truck tolling system to allow the dynamic high-speed weighing of cargo vehicles. In effect the tolling enforcement gantries become weigh-in-motion (WIM) locations.