Skip to main content

Balfour Beatty JV awarded Abu Dhabi airport contract

Balfour Beatty has announced that Power Transmission Gulf (PTG), part of Balfour Beatty's UAE-based joint venture BK Gulf, has been awarded a US$96.1 million joint venture contract to carry out mechanical engineering services on the new Abu Dhabi International Airport Midfield Terminal Building (MTB). The new terminal building will accommodate up to 65 aircraft, including the Airbus A‐380, with an expected capacity of 30 million passengers per year. Check‐in will provide 165 conventional counters and 48
February 12, 2014 Read time: 2 mins
3902 Balfour Beatty has announced that Power Transmission Gulf (PTG), part of Balfour Beatty's UAE-based joint venture BK Gulf, has been awarded a US$96.1 million joint venture contract to carry out mechanical engineering services on the new Abu Dhabi International Airport Midfield Terminal Building (MTB).

The new terminal building will accommodate up to 65 aircraft, including the Airbus A‐380, with an expected capacity of 30 million passengers per year. Check‐in will provide 165 conventional counters and 48 self-service kiosks capable of handling 8,500 passengers, both arriving and departing per hour. The baggage system is designed to process over 19,000 bags per hour with over 22 km of conveying lines and 10 reclaim carousels.

The MTB is designed  to  achieve a Three Pearl rating, based on the Abu Dhabi Urban Planning Council's Estidama approach towards sustainable design, making it the highest‐rated airport terminal in the Gulf Cooperation Council (GCC,) and the largest singular building ever to be rated globally.

The project is due for completion by September 2016.

"I am pleased to announce this new contract with TCA JV," said Andrew McNaughton, Balfour Beatty CEO. "This builds on our existing capabilities in airport infrastructure gathered from around the world and allows us to bring these skills to a key growth region for us."

Related Content

  • June 21, 2018
    Bombardier's Innovia ATM to meet passenger demand at Shenzen Airport
    Bombardier Transportation says its automated people mover (APM) 300 system will help manage increasing passenger numbers at China's Shenzhen Airport, terminal 3. The contract, valued ¥453m (£53m), will be carried out by CRRC Puzhen Bombardier Transportation Systems (PBTS) and is expected to be operational in 2020. PBTS is a joint venture between Bombardier Transportation and Chinese railway rolling stock manufacturer CRRC Nanjing Puzhen. Through the agreement, PBTS will deliver an integrated system
  • January 31, 2012
    State of the art ITS technology for Doha tunnel management system
    Husam Musharbash, Traffic Tech Group, talks about tunnel management system implementation on the new route between Doha and the soon-to-open New Doha International Airport. The new Ras Abu Aboud Tunnel in Qatar, which opened to traffic in January of this year, will serve the New Doha International Airport once the latter opens in 2011.
  • May 26, 2016
    Viaduct deck renewal creates detour dilemma for MassDOT
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab
  • April 30, 2015
    Cable cars come of age in trans-continental expansion
    David Crawford explores a high-level option of public transport. Sharing its origin with that of ski lifts at winter sports resorts in the European Alps, urban aerial cable transport is attracting growing interest as a low-footprint, low-energy alternative to conventional public transport that can swoop over ground-level traffic congestion.