Skip to main content

Balfour Beatty JV awarded Abu Dhabi airport contract

Balfour Beatty has announced that Power Transmission Gulf (PTG), part of Balfour Beatty's UAE-based joint venture BK Gulf, has been awarded a US$96.1 million joint venture contract to carry out mechanical engineering services on the new Abu Dhabi International Airport Midfield Terminal Building (MTB). The new terminal building will accommodate up to 65 aircraft, including the Airbus A‐380, with an expected capacity of 30 million passengers per year. Check‐in will provide 165 conventional counters and 48
February 12, 2014 Read time: 2 mins
3902 Balfour Beatty has announced that Power Transmission Gulf (PTG), part of Balfour Beatty's UAE-based joint venture BK Gulf, has been awarded a US$96.1 million joint venture contract to carry out mechanical engineering services on the new Abu Dhabi International Airport Midfield Terminal Building (MTB).

The new terminal building will accommodate up to 65 aircraft, including the Airbus A‐380, with an expected capacity of 30 million passengers per year. Check‐in will provide 165 conventional counters and 48 self-service kiosks capable of handling 8,500 passengers, both arriving and departing per hour. The baggage system is designed to process over 19,000 bags per hour with over 22 km of conveying lines and 10 reclaim carousels.

The MTB is designed  to  achieve a Three Pearl rating, based on the Abu Dhabi Urban Planning Council's Estidama approach towards sustainable design, making it the highest‐rated airport terminal in the Gulf Cooperation Council (GCC,) and the largest singular building ever to be rated globally.

The project is due for completion by September 2016.

"I am pleased to announce this new contract with TCA JV," said Andrew McNaughton, Balfour Beatty CEO. "This builds on our existing capabilities in airport infrastructure gathered from around the world and allows us to bring these skills to a key growth region for us."

For more information on companies in this article

Related Content

  • Canada looks to HOT lanes to tackle congestion
    March 16, 2017
    David Crawford sees an evidence-based approach to HOT lane conversions. Canada’s first high occupancy toll (HOT) lanes opened on 16 September 2016 as a pilot on a 16.5km section of existing high occupancy vehicle (HOV) lanes running in both directions along Toronto’s Queen Elizabeth Way. Promised in two recent budgets
  • Self-driving shared vehicles ‘could take most cars off city streets’
    May 1, 2015
    Fleets of TaxiBots and AutoVots could deliver today’s mobility with significantly fewer cars, says a new study. Self-driving shared cars could make 90 per cent of conventional cars in mid-sized cities superfluous, according to the study published by the International Transport Forum at the OECD. Even during peak hours, only one third of the current number of cars would be needed to provide the same number of trips as today. ITF researchers used actual transport data from Lisbon, Portugal, to model the
  • Roads and bridges projects in Middle East valued at US$109 million
    September 30, 2013
    Ahead of December’s Gulf Traffic exhibition in Dubai, the latest figures from Ventures Middle East indicate ongoing roads and bridges projects across the Gulf Co-operation Council (GCC) region are currently valued at US$109 billion. Host of the 2022 Football World Cup, Qatar, leads the way with an allocation of US$20bn for roads and highways, in addition to a US$35bn rail network. The UAE, second worldwide for roads quality in the latest Travel and Tourism Competitiveness Report, has investments worth
  • Thales Siemens JV wins Spanish high speed rail contract
    August 17, 2015
    Spanish rail administrator Adif has awarded the Thales and Siemens joint venture a US$38.6 million contract to carry out works for the signalling facilities, train protection systems, fixed telecommunications and centralised traffic control for the Chamartín-Torrejón de Velasco section of Spain’s high speed rail network. The project also includes work on the 7.3 km long Atocha-Chamartín tunnel and a maintenance period of 36 months. Siemens Rail Automation will be responsible for modernising the Trackguar