Skip to main content

Balfour Beatty JV awarded Abu Dhabi airport contract

Balfour Beatty has announced that Power Transmission Gulf (PTG), part of Balfour Beatty's UAE-based joint venture BK Gulf, has been awarded a US$96.1 million joint venture contract to carry out mechanical engineering services on the new Abu Dhabi International Airport Midfield Terminal Building (MTB). The new terminal building will accommodate up to 65 aircraft, including the Airbus A‐380, with an expected capacity of 30 million passengers per year. Check‐in will provide 165 conventional counters and 48
February 12, 2014 Read time: 2 mins
3902 Balfour Beatty has announced that Power Transmission Gulf (PTG), part of Balfour Beatty's UAE-based joint venture BK Gulf, has been awarded a US$96.1 million joint venture contract to carry out mechanical engineering services on the new Abu Dhabi International Airport Midfield Terminal Building (MTB).

The new terminal building will accommodate up to 65 aircraft, including the Airbus A‐380, with an expected capacity of 30 million passengers per year. Check‐in will provide 165 conventional counters and 48 self-service kiosks capable of handling 8,500 passengers, both arriving and departing per hour. The baggage system is designed to process over 19,000 bags per hour with over 22 km of conveying lines and 10 reclaim carousels.

The MTB is designed  to  achieve a Three Pearl rating, based on the Abu Dhabi Urban Planning Council's Estidama approach towards sustainable design, making it the highest‐rated airport terminal in the Gulf Cooperation Council (GCC,) and the largest singular building ever to be rated globally.

The project is due for completion by September 2016.

"I am pleased to announce this new contract with TCA JV," said Andrew McNaughton, Balfour Beatty CEO. "This builds on our existing capabilities in airport infrastructure gathered from around the world and allows us to bring these skills to a key growth region for us."

Related Content

  • March 23, 2012
    Breakthrough battery could revolutionise cost, range and safety of electric vehicles
    Envia Systems, based in California, has announced test results that verify the company’s next-generation rechargeable battery has achieved the highest recorded energy density of 400 Watt-hours/kilogram (Wh/kg) for a rechargeable lithium-ion cell. When commercialised, this 400 Wh/kg battery is expected to slash the price of a 500km range electric vehicle by cutting the cost of the battery pack by more than 50 per cent. The testing of Envia’s next-generation lithium-ion battery was performed by the Electroche
  • September 30, 2015
    Canadian JV to build next phase of Ontario BRT
    Metrolinx and York Region Rapid Transit Corporation (YRRTC) today announced the award of a US$248 million contract to the EDCO joint venture to design, build and finance the next phase of the dedicated York Viva Bus Rapid Transit rapidways along the Highway 7 transit corridor Southern Ontario, Canada. This initiative is part of the York Viva BRT project which represents a US$1 billion transit investment from the Government of Ontario and is part of Metrolinx's 25-year Regional Transportation Plan for an
  • May 27, 2022
    Papercast digital info for Bahrain buses
    Gulf state joins Abu Dhabi, Dubai, Kuwait, Makkah and Qatar in using e-paper displays
  • July 26, 2013
    Qatar invests $70 billion to pave the way to world beating transportation
    Eng. Zeina Nazer looks at what Qatar’s recently-announced investment in transport infrastructure will mean on the ground. Qatar is experiencing a rapid economic and industrial growth. This growth is characterised by a rapid population increase and by the urgent need towards the development of both infrastructure projects and major transport projects. In order to handle this rate of development within Qatar, Public Works Authority (Ashghal) is developing a fully-integrated multimodal transportation system in