Skip to main content

Balfour Beatty JV awarded Abu Dhabi airport contract

Balfour Beatty has announced that Power Transmission Gulf (PTG), part of Balfour Beatty's UAE-based joint venture BK Gulf, has been awarded a US$96.1 million joint venture contract to carry out mechanical engineering services on the new Abu Dhabi International Airport Midfield Terminal Building (MTB). The new terminal building will accommodate up to 65 aircraft, including the Airbus A‐380, with an expected capacity of 30 million passengers per year. Check‐in will provide 165 conventional counters and 48
February 12, 2014 Read time: 2 mins
3902 Balfour Beatty has announced that Power Transmission Gulf (PTG), part of Balfour Beatty's UAE-based joint venture BK Gulf, has been awarded a US$96.1 million joint venture contract to carry out mechanical engineering services on the new Abu Dhabi International Airport Midfield Terminal Building (MTB).

The new terminal building will accommodate up to 65 aircraft, including the Airbus A‐380, with an expected capacity of 30 million passengers per year. Check‐in will provide 165 conventional counters and 48 self-service kiosks capable of handling 8,500 passengers, both arriving and departing per hour. The baggage system is designed to process over 19,000 bags per hour with over 22 km of conveying lines and 10 reclaim carousels.

The MTB is designed  to  achieve a Three Pearl rating, based on the Abu Dhabi Urban Planning Council's Estidama approach towards sustainable design, making it the highest‐rated airport terminal in the Gulf Cooperation Council (GCC,) and the largest singular building ever to be rated globally.

The project is due for completion by September 2016.

"I am pleased to announce this new contract with TCA JV," said Andrew McNaughton, Balfour Beatty CEO. "This builds on our existing capabilities in airport infrastructure gathered from around the world and allows us to bring these skills to a key growth region for us."

Related Content

  • August 28, 2013
    Riyadh metro contracts awarded
    The contracts for the design and construction of Riyadh’s new US$22.5 billion metro system, the next major step in the development of the largest public transport project in the world - the Riyadh Public Transport Project. The Project encompasses a city-wide metro, bus network, and park and ride services. The Arriyadh Development Authority (ADA) has announced that Riyadh Metro Transit Consultants (RMTC), a joint venture between US firm Parsons and French firms Egis and Systra, has been awarded the first
  • October 15, 2013
    Transport for London awards EQM contract
    Passengerfta is to supply Transport for London (TfL) with engineering quality monitoring (EQM) and will carry out quality monitoring inspections and audits on London’s 8,500-strong bus fleet. As part of the Freight Transport Association (FTA), Passengerfta offers a range of services designed for passenger carrying vehicle (PCV) operators and carries out thousands of PSV inspections throughout the United Kingdom and Eire every year.
  • February 13, 2015
    New Mexico City airport 'the most advanced worldwide'
    The new international airport being built in Mexico City is "probably the most advanced modern airport project worldwide," Dr Bernardo Lisker, international director of The Mitre Corporation, has said. "This is an enormously important project for Mexico, without which the nation's economy would suffer a bottleneck very soon," said Lisker, who will be discussing the technical vision of the airport at BNamericas' Mexico Infrastructure Summit taking place 18–19 February. "Building the new airport in the
  • December 10, 2015
    Masdar City PRT sets record highs in fifth year
    The Masdar City personal rapid transit (PRT) system in Abu Dhabi has just completed its fifth year of operations, setting all time highs in number of passengers carried per month and per year, passenger growth and system availability. Since the start of operations on 28 November 2010 one can only conclude automated passenger transport is a rock solid, reliable and efficient solution for both passengers as well as stakeholders. The Masdar PRT operates 18 hours a day, every day and is led by 2getthere in c