Skip to main content

Australian highway upgrade gets under way

Work has begun on a US$130.8 million major upgrade to the Bruce Highway to increase the route’s capacity in north Queensland. The upgrade will increase seven kilometres of highway from two lanes to four lanes, with major works to be carried out on the intersections at Hunter Street, Abbott Street, Lakeside Drive and Stuart Drive. Federal MP George Christensen says a four lane overpass of the rail line at Cluden will be built to separate traffic from the existing open level crossing to improve safety on
October 31, 2013 Read time: 1 min
Work has begun on a US$130.8 million major upgrade to the Bruce Highway to increase the route’s capacity in north Queensland.  The upgrade will increase seven kilometres of highway from two lanes to four lanes, with major works to be carried out on the intersections at Hunter Street, Abbott Street, Lakeside Drive and Stuart Drive.

Federal MP George Christensen says a four lane overpass of the rail line at Cluden will be built to separate traffic from the existing open level crossing to improve safety on the highway.

“The project will also construct two new bridges over Stuart Creek, as well as new drainage structures under other sections to improve flood immunity and reduce the number of highway closures because of flooding,” he says.

All works are due to be completed by mid-2015.

Related Content

  • The sunshine subsidy for Colorado’s tollways
    January 10, 2014
    David Crawford reports on energy cost cutting on US highways. Just over a year after switch-on and with two global awards under its belt, the longest solar-powered toll road in the US is generating heightened interest in highway applications of alternative energy. The E-407, which loops around the eastern perimeter of the Denver metropolitan area in Colorado, won the International Bridge, Tunnel and Turnpike Association (IBTTA) President’s Overall Award for Excellence at its September 2013 Annual Meeting in
  • Monitoring during construction reveals benefits of new expressway
    June 6, 2014
    David Crawford reports on how the authorities in New Zealand are using Bluetooth technology to monitor the effects of a new expressway as it is being constructed. New Zealand Highway Agency (NZHA) is using Bluetooth-based vehicle detection to assess the impact of its biggest road building project as the various sections are completed. The large-scale deployment of a Bluetooth-based vehicle detection system is making substantial contributions to traffic data needs in progressing the new Waikato Expressway, a
  • Lima to invest in subway lines
    October 24, 2014
    Peru will invest nearly US$10 billion in the construction of Lima metro lines No. 3 and 4, private investment promotion agency ProInversión forecast at BNamericas 5th South America Infrastructure Summit. ProInversión recently awarded a pre-investment studies contract for line No. 3 and in coming the months will launch pre-investment and feasibility studies for line No. 4. "These are projects that, given similar characteristics to line No. 2 – more than 30 kilometres long and all built underground – s
  • Mounting benefits of dynamic tolling project
    January 30, 2012
    Wisconsin's four-year HOT lanes pilot project, launched in May 2008, cost US$18.8 million to construct. Halfway into the project, which uses variably priced, or dynamic, tolling to improve highway efficiency, the benefits are mounting. The problem was obvious, and frustrating, to anyone who ever sat in bumper-to-bumper traffic on State Route 167 and watched a lone car whiz by every 20 seconds or so in the carpool lane. But for planners at the Washington State Department of Transportation, the conundrum was