Skip to main content

Auckland’s Waterview Tunnel to open

Construction work on Auckland’s US 1 billion (NZ$1.4 billion) Waterview Tunnel has been completed and the twin 2.4km-long three-lane tunnels are expected to open to traffic in early July.
June 22, 2017 Read time: 1 min

Construction work on Auckland’s US$1 billion (NZ$1.4 billion) Waterview Tunnel has been completed and the twin 2.4km-long three-lane tunnels are expected to open to traffic in early July. The tunnel is the final link in the Western Ring Route, a new 48km route linking the west of Auckland, Manukau, the city and the North Shore.

New Zealand transport minister Bridges says the Waterview Tunnel completion marks the biggest change in Auckland’s transport system since the opening of the Auckland Harbour Bridge in 1959.

Wider economic benefits are estimated to be worth US$3 million (NZ$430 million), through improved productivity and reduced travel time, and also include the creation of more than 18,000 jobs.

This latest connection in Auckland’s state highway network is expected to provide a more resilient and reliable motorway network by reducing the current dependence on State Highway 1 and the Auckland Harbour Bridge.

Related Content

  • Viaduct deck renewal creates detour dilemma for MassDOT
    May 26, 2016
    As the deck renewal of the I-91 viaduct in Springfield gets underway, David Crawford looks at the preparation and planning to ease the resulting traffic congestion. Accommodating the deck renewal of a 4km-long/four-lanes in each direction viaduct in the heart of Springfield (Massachusetts’ third largest city), has involved the state’s Department of Transportation (MassDOT) in a massive exercise in transport research and ITS-based area-wide preplanning and traffic management. Supporting a workzone of well ab
  • Kapsch tunnels into US and Brazil
    April 21, 2025
    Projects in Florianópolis & Fort Lauderdale completed - and Hawaii awarded
  • Electronic tolling coming to New Zealand in 2015
    March 27, 2015
    New Zealand is to implement multi-lane free flow tolling on key routes in Tauranga later this year, with the installation of two high-tech electronic tolling gantries, each with 16 cameras, on Tauranga Eastern Link (TEL) and Route K. The cameras will capture an image of the vehicle’s front and rear registration plates using the latest optical character recognition technology. The cameras will read the registration plates and determine the size of the vehicle and whether it is a motorcycle, car, truck or
  • UK government’s US$283 million road building boost for Bedfordshire
    March 4, 2016
    Two road-building schemes worth US$283 million, which are a key part of the UK government’s long-term economic plan for Bedfordshire, are on course to be delivered on time and on budget by spring 2017. The 2.8 mile, US$229 million A5-M1 Link scheme is being delivered by Highways England, while the US$54 million, 1.8 mile Woodside Link project is being completed by Central Bedfordshire Council. The A5-M1 Link dual carriageway project is intended to improve the east-west connection between the A5 and M1