Skip to main content

Auckland’s Waterview Tunnel to open

Construction work on Auckland’s US 1 billion (NZ$1.4 billion) Waterview Tunnel has been completed and the twin 2.4km-long three-lane tunnels are expected to open to traffic in early July.
June 22, 2017 Read time: 1 min

Construction work on Auckland’s US$1 billion (NZ$1.4 billion) Waterview Tunnel has been completed and the twin 2.4km-long three-lane tunnels are expected to open to traffic in early July. The tunnel is the final link in the Western Ring Route, a new 48km route linking the west of Auckland, Manukau, the city and the North Shore.

New Zealand transport minister Bridges says the Waterview Tunnel completion marks the biggest change in Auckland’s transport system since the opening of the Auckland Harbour Bridge in 1959.

Wider economic benefits are estimated to be worth US$3 million (NZ$430 million), through improved productivity and reduced travel time, and also include the creation of more than 18,000 jobs.

This latest connection in Auckland’s state highway network is expected to provide a more resilient and reliable motorway network by reducing the current dependence on State Highway 1 and the Auckland Harbour Bridge.

Related Content

  • US congestion costs continue to rise
    January 25, 2012
    The 2010 Urban Mobility Report, published by the Texas Transportation Institute at Texas A&M University, concludes that after two years of slight declines in overall traffic congestion - attributable to the economic downturn and high fuel prices - leading indicators suggest that as the economy rebounds, traffic problems are doing the same. While 2008 was the best year for commuters in at least a decade, the problem again began to grow in 2009.
  • Section of M6 motorway to be made ‘smart’
    November 1, 2013
    A section of the M6 motorway in the UK between junctions 10a and 13 is to be upgraded to a smart (managed) motorway with all-lane running. This section of the motorway is a major strategic route, carrying around 120,000 vehicles per day.
  • AMG transmission system used in Blackwall Tunnel refurbishment
    May 18, 2012
    AMG Systems has announced it has been selected to supply the transmission solution for the refurbished Victorian-built Blackwall Tunnel under the river Thames in London. The three-year refurbishment programme, costing over US$113 million, is being undertaken by Transport for London (TfL) to bring the tunnel up to European safety regulations. P. Ducker Systems (PDS) is undertaking the task of supplying the tunnel systems for the project.
  • New Zealand government ‘open to tolling’ in Auckland
    February 17, 2017
    The New Zealand government has confirmed that it is considering the introduction of open road tolling in Auckland. Finance minister Steven Joyce told a business audience the government could support tolling but would not support a regional fuel tax. He said, “There is no getting away from the fact that central Auckland is built on a narrow isthmus which makes it hard to get around – and the available land transport corridors are rapidly being used. “So beyond the current building programme we are g