Skip to main content

Auckland’s Waterview Tunnel to open

Construction work on Auckland’s US 1 billion (NZ$1.4 billion) Waterview Tunnel has been completed and the twin 2.4km-long three-lane tunnels are expected to open to traffic in early July.
June 22, 2017 Read time: 1 min

Construction work on Auckland’s US$1 billion (NZ$1.4 billion) Waterview Tunnel has been completed and the twin 2.4km-long three-lane tunnels are expected to open to traffic in early July. The tunnel is the final link in the Western Ring Route, a new 48km route linking the west of Auckland, Manukau, the city and the North Shore.

New Zealand transport minister Bridges says the Waterview Tunnel completion marks the biggest change in Auckland’s transport system since the opening of the Auckland Harbour Bridge in 1959.

Wider economic benefits are estimated to be worth US$3 million (NZ$430 million), through improved productivity and reduced travel time, and also include the creation of more than 18,000 jobs.

This latest connection in Auckland’s state highway network is expected to provide a more resilient and reliable motorway network by reducing the current dependence on State Highway 1 and the Auckland Harbour Bridge.

Related Content

  • Weigh in motion reduces road wear, increases toll revenue
    January 24, 2012
    IRD, Inc's Terry Bergan discusses future applications of weigh in motion technology. The application in recent years of Weigh In Motion (WIM) at tollgates has been driven by recognition of the fact that there is economic value, which can be levied, attached to Heavy Goods Vehicles (HGVs) which haul laden (and are therefore heavy) rather than empty. As wear and damage to road surfaces increases exponentially with weight, the targeting of HGVs in particular makes sense from both the economic and maintenance p
  • Kapsch outlines tolling options to combat traffic congestion
    January 11, 2017
    Michael Maitland from Kapsch TrafficCom looks at how the various forms of tolling can help authorities combat traffic congestion and air quality problems while simultaneously raising revenue.
  • Active traffic management increases safety and capacity
    February 2, 2012
    WSDOT is deploying Active Traffic Management in order to increase safety and capacity on its strategic roads. WSDOT's Patricia Michaud elaborates
  • Is the US economic stimulus programme working?
    January 30, 2012
    In this third installment in a series of articles exploring the impact of the US economic stimulus programme on the ITS industry, Pete Goldin reports on the ongoing debate in Congress about American Recovery and Reinvestment Act. A debate continues to rage in the US Congress and in the media about the effectiveness of the American Recovery and Reinvestment Act of 2009 (ARRA), and especially the timeliness of the ARRA payments. Some of the arguments seem somewhat partisan in origin while others point out fla