Skip to main content

Auckland’s Waterview Tunnel to open

Construction work on Auckland’s US 1 billion (NZ$1.4 billion) Waterview Tunnel has been completed and the twin 2.4km-long three-lane tunnels are expected to open to traffic in early July.
June 22, 2017 Read time: 1 min

Construction work on Auckland’s US$1 billion (NZ$1.4 billion) Waterview Tunnel has been completed and the twin 2.4km-long three-lane tunnels are expected to open to traffic in early July. The tunnel is the final link in the Western Ring Route, a new 48km route linking the west of Auckland, Manukau, the city and the North Shore.

New Zealand transport minister Bridges says the Waterview Tunnel completion marks the biggest change in Auckland’s transport system since the opening of the Auckland Harbour Bridge in 1959.

Wider economic benefits are estimated to be worth US$3 million (NZ$430 million), through improved productivity and reduced travel time, and also include the creation of more than 18,000 jobs.

This latest connection in Auckland’s state highway network is expected to provide a more resilient and reliable motorway network by reducing the current dependence on State Highway 1 and the Auckland Harbour Bridge.

Related Content

  • Crossrail project receives US$814 million EIB funding
    December 16, 2013
    The European Investment Bank (EIB), Europe’s long-term lending institution, has provided further funds to support the latest step in Crossrail’s development with a loan of up to US$814 million to Transport for London (TfL). The facility will be used for financing a fleet of new high-capacity air-conditioned trains as well as a new maintenance depot. Finance contracts were signed in London this week by Steve Allen, TfL’s Managing Director Finance and Jonathan Taylor, European Investment Bank Vice President.
  • Kapsch to provide AET for New York State Thruway
    July 22, 2014
    Kapsch TrafficCom is to provide the New York State Thruway Authority with the development, installation and technical support for an all electronic tolling (AET) system. This new system eliminates the need for Thruway patrons to stop or slow down at tolling points. By enabling toll transactions to be completed at highway speeds, the AET system facilitates free-flowing traffic across multiple lanes to minimise congestion; the resulting reduction in vehicle emissions will have a direct, beneficial environm
  • New Zealand’s smart motorway opens
    July 15, 2016
    Commuters heading north on Wellington’s urban motorway will now get a smoother trip as the new lane is fully opened and New Zealand’s first smart motorway is turned on in the northbound direction. Using variable speed limits, which will be adjusted in real time in response to changing traffic conditions, the smart motorway will pace vehicles to smooth the traffic flow. Officials say this will result in safer journeys with more predictable travel times. It will also free up nearby roads for better public
  • Huawei addresses congested, separated rail networks with cloud solution
    December 20, 2024
    A shift to a cloud-based operating regime solves the problems of trying to make cluttered, geographically-discrete terrestrial systems work together