Skip to main content

Auckland’s Waterview Tunnel to open

Construction work on Auckland’s US 1 billion (NZ$1.4 billion) Waterview Tunnel has been completed and the twin 2.4km-long three-lane tunnels are expected to open to traffic in early July.
June 22, 2017 Read time: 1 min

Construction work on Auckland’s US$1 billion (NZ$1.4 billion) Waterview Tunnel has been completed and the twin 2.4km-long three-lane tunnels are expected to open to traffic in early July. The tunnel is the final link in the Western Ring Route, a new 48km route linking the west of Auckland, Manukau, the city and the North Shore.

New Zealand transport minister Bridges says the Waterview Tunnel completion marks the biggest change in Auckland’s transport system since the opening of the Auckland Harbour Bridge in 1959.

Wider economic benefits are estimated to be worth US$3 million (NZ$430 million), through improved productivity and reduced travel time, and also include the creation of more than 18,000 jobs.

This latest connection in Auckland’s state highway network is expected to provide a more resilient and reliable motorway network by reducing the current dependence on State Highway 1 and the Auckland Harbour Bridge.

Related Content

  • Idaho WIM systems save trucking industry time and money
    September 5, 2017
    Figures released by the Idaho Transportation Department indicate that weigh-in-motion (WIM) systems installed at the state’s four points of entry (POE) have saved the trucking industry time and money in the last year. The data shows that trucks bypassing the port save an average of five minutes of time per incident, and almost a half a gallon of fuel. This amounts to a savings of about US$8.68 per bypass. Commercial trucks using WIM to bypass Idaho ports saved 33,365 hours and more than 16,000 gallons of
  • Aarsleff to build tunnels on new Danish railway
    February 7, 2014
    Banedanmark (Rail Net Denmark) has awarded construction company Per Aarsleff a US$ 166.66 million contract to build two tunnels on the 3.7 km tunnel of the new railway route between Copenhagen and Ringsted. The project will be carried out as a turnkey contract during the next three years with expected completion in the spring of 2017. The two tunnels, of 560 metres and 695 metres respectively, are to be carried out as cut and cover tunnels built on site in open excavations down to a depth of 11 met
  • AI is creating road maintenance savings
    July 30, 2021
    Artificial intelligence is starting to create savings for hard-pressed local authorities when it comes to road maintenance. David Crawford reviews recent advances in cost and performance control
  • ASECAP examines tolling during downturns
    September 22, 2014
    ASECAP debated the impact of the financial crises on Europe’s tolling companies and considered the future in diverse economies. Colin Sowman picks some of the highlights. This year ASECAP (Association Europeenne des Concessionnaires d’Autoroutes et d’Ouvrages a’ Peage, with members in 21 countries managing 46,000km of roadway) held its annual Study & Information Days in Athens, Greece – one of the country hardest hit by recent economic problems. While the theme of the conference, Ensuring Sustainability in