Skip to main content

Auckland’s Waterview Tunnel to open

Construction work on Auckland’s US 1 billion (NZ$1.4 billion) Waterview Tunnel has been completed and the twin 2.4km-long three-lane tunnels are expected to open to traffic in early July.
June 22, 2017 Read time: 1 min

Construction work on Auckland’s US$1 billion (NZ$1.4 billion) Waterview Tunnel has been completed and the twin 2.4km-long three-lane tunnels are expected to open to traffic in early July. The tunnel is the final link in the Western Ring Route, a new 48km route linking the west of Auckland, Manukau, the city and the North Shore.

New Zealand transport minister Bridges says the Waterview Tunnel completion marks the biggest change in Auckland’s transport system since the opening of the Auckland Harbour Bridge in 1959.

Wider economic benefits are estimated to be worth US$3 million (NZ$430 million), through improved productivity and reduced travel time, and also include the creation of more than 18,000 jobs.

This latest connection in Auckland’s state highway network is expected to provide a more resilient and reliable motorway network by reducing the current dependence on State Highway 1 and the Auckland Harbour Bridge.

Related Content

  • Victorian Government to fund second river crossing
    April 18, 2016
    The Victorian Government in Australia is to provide the full funding for the Western Distributor Project, a second river crossing which includes the Monash Freeway Upgrade and upgrades to Webb Dock, after the Federal Government rejected a request for a contribution to the funding. Construction of the US$4.2 billion (AU$5.5 billion) Western Distributor will start in 2017, local motorists paying for the rest of it with tolls extended until 2045. The Government and Transurban in Australia have now signed
  • Lancashire road and rail improvements announced
    September 20, 2013
    Plans for projects to update the road and rail networks in Lancashire have been announced by Transport for Lancashire, a new body comprising Lancashire County Council, Blackburn with Darwen Council and Blackpool Borough Council. The projects will develop, approve and fund major transport infrastructure work with a US$152 million budget from the (DfT) Department for Transport the City Deal for the Preston area, and developer contributions.
  • Worldwide contract wins for Kapsch
    December 3, 2012
    Kapsch TrafficCom IVHS is to supply the Texas Department of Transportation with the company’s IDS 2.0 integrated incident detection system for the Washburn Tunnel in Houston, Texas. The non-invasive detection system will be linked to 14 fixed roadway cameras for detection of incidents in the two-way vehicular tunnel and up to six infrared intrusion detection cameras in the ventilation tunnel, enabling tunnel operators to provide cost-effective continuous 24/7 surveillance and monitoring. In South America, K
  • Maharashtra confirms hyperloop route in India
    February 26, 2018
    Virgin Hyperloop One (VHO) has signed an agreement with the Indian State of Maharashtra to create a route that intends to link central Pune, Navi Mumbai International Airport in 25minutes and connect 26 million people. It aims to eventually support 150 passenger trips annually and save more than 90 million hours of travel time. In addition, an initial pre-feasibility study by VHO indicates that the route could provide socio-economic benefits valued $55m (£39m) over 30 years of operation. It will be deploy