Skip to main content

Auckland’s Waterview Tunnel to open

Construction work on Auckland’s US 1 billion (NZ$1.4 billion) Waterview Tunnel has been completed and the twin 2.4km-long three-lane tunnels are expected to open to traffic in early July.
June 22, 2017 Read time: 1 min

Construction work on Auckland’s US$1 billion (NZ$1.4 billion) Waterview Tunnel has been completed and the twin 2.4km-long three-lane tunnels are expected to open to traffic in early July. The tunnel is the final link in the Western Ring Route, a new 48km route linking the west of Auckland, Manukau, the city and the North Shore.

New Zealand transport minister Bridges says the Waterview Tunnel completion marks the biggest change in Auckland’s transport system since the opening of the Auckland Harbour Bridge in 1959.

Wider economic benefits are estimated to be worth US$3 million (NZ$430 million), through improved productivity and reduced travel time, and also include the creation of more than 18,000 jobs.

This latest connection in Auckland’s state highway network is expected to provide a more resilient and reliable motorway network by reducing the current dependence on State Highway 1 and the Auckland Harbour Bridge.

Related Content

  • Highways Agency plans to increase capacity of M4
    March 19, 2014
    The UK Highways Agency is holding a series of public exhibitions to inform road users, local residents and businesses about proposals to transform the M4 into one of the longest stretches of ‘smart motorway’ in England by 2021. The improvement, on a 32-mile stretch between junction 3 at Hayes in London, and junction 12 at Theale in Berkshire, would increase capacity, improve journey reliability and maintain safety. The proposals are part of the Government’s investment into England’s motorways and majo
  • Vancouver's metro transport promotes alternatives to driving
    January 26, 2012
    David Crawford looks at Vancouver and the legacy of a Olympic transport success
  • State of the art ITS technology for Doha tunnel management system
    January 31, 2012
    Husam Musharbash, Traffic Tech Group, talks about tunnel management system implementation on the new route between Doha and the soon-to-open New Doha International Airport. The new Ras Abu Aboud Tunnel in Qatar, which opened to traffic in January of this year, will serve the New Doha International Airport once the latter opens in 2011.
  • Asecap Days 2024: Getting used to the new normal
    August 27, 2024
    Asecap Days 2024 in Milan focused on environmental protection of road infrastructure, digital twin-based maintenance and monitoring of highways as well as the impact of electric vehicles, reports David Arminas