Skip to main content

Astaldi wins rail upgrade contract in Poland

The Italian Astaldi Group has been awarded the contract by Polskie Linie Kolejowe (PKP) to upgrade a section of the E-59 Warsaw-Poznań railway line (Lot IV).
June 28, 2017 Read time: 1 min

The Italian Astaldi Group has been awarded the contract by Polskie Linie Kolejowe (PKP) to upgrade a section of the E-59 Warsaw-Poznań railway line (Lot IV).

The US$93 million (€82 million contract calls for the reconstruction of track systems for 35 kilometres on the existing line along with the construction of two railway stations, the upgrading of the line’s viaduct system, as well as the building of two additional viaducts. The works will be carried out without interruption of the railway traffic on the line. The works are expected to last slightly more than 2 years.
 
Astaldi will carry out the works in a joint venture with CLF, Italy. The works will be financed by European funds and by the State budget.

Related Content

  • Toll performance exceeds expectations, improves travel times
    January 30, 2012
    Jean Harito, Attica Tollway Operations Authority and Steve Morello, Egis Projects describe how looking to exceed contractual obligations makes good operational and business sense. The Attica Tollway is a modern, 65km, access-controlled urban motorway with three lanes in each direction. It constitutes the ring road around the extensive metropolitan area of the Greek capital, Athens, and forms the backbone of the entire road network in the Attica region. By ensuring freeflow operating conditions, the Attica T
  • AECOM secures third Menai Crossing contract
    April 27, 2017
    Infrastructure services firm AECOM has secured a contract with the Welsh Government to deliver design services for the new third crossing of the Menai Strait. Under the contract, AECOM will undertake the Key Stage 2 Appraisal of options to identify and develop initial designs for a new bridge crossing that will link Anglesey with mainland Wales, with a view to identifying a preferred route. The new Menai crossing is intended to alleviate traffic on the two existing bridges over the Menai Strait. The Menai B
  • IRD wins $1.2 million Indiana contract
    April 18, 2012
    International Road Dynamics (IRD) has announced the award of a Quantity Purchase Agreement for weigh-in-motion (WIM) and virtual weigh-in-motion (VWIM) systems, maintenance, and repair from the Indiana Department of Transportation (INDOT). Under this agreement, IRD will be issued task orders to deliver, install, commission, calibrate, and support WIM and VWIM equipment at numerous locations across the state.
  • Small toll agency adopts big city thinking
    December 5, 2014
    Andrew Bardin Williams looks at a novel option for new toll road authorities. While somewhat politically controversial, outsourcing has gained traction in the business world as a model worth investigating for its efficiency and cost saving benefits. Lean start-ups tend to employ independent contractors instead of full-time employees in an effort to remain flexible and avoid costs associated with pensions, retirement places, health insurance, office space and benefit packages.