Skip to main content

Asian high speed rail link tender expected late 2014

Officially launched in February 2013, tenders for the high-speed rail link project between Kuala Lumpur and Singapore will be received towards the end of 2014, Mohd Nur Kamal, the CEO of Malaysia's Land Public Transport Commission (SPAD) has announced. Although the two governments continue to work on technical details and feasibility studies, various parties have already voiced an interest. The railway, which will connect the two countries at speeds exceeding 300 km/h, will reduce the journey time between t
July 29, 2013 Read time: 2 mins
Officially launched in February 2013, tenders for the high-speed rail link project between Kuala Lumpur and Singapore will be received towards the end of 2014, Mohd Nur Kamal, the CEO of Malaysia's 7432 Land Public Transport Commission (SPAD) has announced. Although the two governments continue to work on technical details and feasibility studies, various parties have already voiced an interest.
 
The railway, which will connect the two countries at speeds exceeding 300 km/h, will reduce the journey time between the capitals from six hours to a mere ninety minutes.

The entire 330 km project is set to be completed by 2020 at a cost in the region of US$12.5 billion.
 
The proposal should not be seen as a project benefiting only the present generation but many generations to come, says rail infrastructure expert Colin Stewart of international engineering consultancy Arup.  He said: "You are building something that is a legacy for the future. It would be here for at least 100 years.
 
"We tend to think in terms of very short payback periods. There are many other things we do as countries and cities that are not so easily quantifiable in terms of payback. For instance, we build roads, even to remote parts, without thinking much about payback."
 
Three firms have shown interest in the project: UEM, sponsored by government investment arm Khazanah Nasional; the Malaysian tycoon Syed Moktar Al-Bukhary backed MMC Gamuda; and YTL Corp which had previously constructed the express rail link to the Kuala Lumpur international airport.
 
The Singaporean and Malaysian governments hope that the new rail link will ease offer passengers much-needed modernisation, turn local airports into vital transport hubs, invigorate manufacturing and boost tourism and house prices.

For more information on companies in this article

Related Content

  • Siemens and Hyundai propose concession company for Moscow metro construction
    April 20, 2012
    Siemens and Hyundai have made a proposal to Moscow’s government to form a concession company for underground construction. The company is not only to build the metro and supply the rolling stock but also get a concession for land plots.
  • Smart Cities put people, prudence and businesses before technology
    December 4, 2014
    Caroline Haynes tells ITS International that transport planners and equipment suppliers need to adopt different thinking and the smartest cities don’t call themselves smart. The term Smart Cities has been around for some time and has become something of a catch-all term applied to novel or futuristic technology deployed in an urban setting.
  • Network Rail launches digital strategy to improve travel experience
    May 14, 2018
    Network Rail will carry out a digital railway strategy to help ensure that all new UK trains and signalling are digital or digital ready from 2019. The upgrade is aimed at improving the speed, punctuality and safety of the service. New digital rail technology will be utilised with the intention of allowing trains to run closer together and provide more frequent services. In addition, passengers are expected to be provided with improved mobile and WiFi connectivity. Train drivers will receive real-time
  • Autonomous driving – what can we really expect?
    June 6, 2016
    Dave Marples of Technolution BV looks beyond the hype to the practical implementation of autonomous vehicles. Having looked at the development of this sector for some time, I am concerned about the current state of autonomous driving development as engineering (and marketing) have run way ahead of the wider systemic, and legislative, requirements to support an autonomous future.