Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • The case for tolling the Interstates
    April 20, 2012
    Speaking at an event organised by the IBTTA last week to an audience of federal and state transportation officials, policy experts, financial analysts, and representatives from engineering firms, technology companies, and transportation facility operators, Ed Regan of Wilbur Smith Associates articulated a clear case for giving states flexibility to toll existing interstate highways.
  • Three's no crowd with Yunex rapid charger
    September 21, 2021
    QC60-120 kW can simultaneously charge up to three EVs and is widely compatible
  • Driivz to offer plug & play EV charging 
    September 27, 2021
    Collaboration with Hubject allows drivers to start charging without swiping credit card
  • POD Point partners with Nissan GB on EV charging
    May 19, 2016
    Electric vehicle charging company POD Point has become an approved supplier of home electric vehicle (EV) charging solutions for Nissan GB, the manufacturer of the Leaf electric car, which has sold over 12,000 in the UK. POD Point’s new status as an approved home charging unit supplier means that anyone purchasing a Nissan plug-in vehicle will be able to easily access a charge point for their home. The POD Point Solo is a reliable home charge unit which can be installed within ten working days. POD Po