Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • UK motor racing circuit installs EV charging
    December 6, 2016
    Electric vehicle (EV) charging company ChargePoint has installed EV charging facilities at Thruxton motor racing circuit near Andover in the UK. The Rapid charger and twin Fast charger are operated by ChargePoint Services’ GeniePoint Network and can be accessed via robust RFID card access or smartphone App and will be available for public access seven days a week. Situated just half a mile off the busy A303, they are ideally positioned for EV drivers to recharge whilst travelling between Hampshire and
  • New guide to EV Charging & Infrastructure
    November 14, 2022
    ITS International's sister website is launching to cover the growing business of EV infrastructure
  • Orange County awards Iteris traffic signal synchronisation contract
    July 8, 2015
    Iteris is to carry out upgrades to traffic signal infrastructure and signal timing improvements along an eight-mile stretch of a major corridor spanning three California cities: Santa Ana, Costa Mesa, and Newport Beach under a US$2.1 million contract awarded by the Orange County Transportation Authority (OCTA). Under the project agreement, Iteris will design and implement traffic signal electronics and fibre-optic communications equipment, and will synchronise all 45 traffic lights along the entire Brist
  • ODoT targets transportation funding solutions and alternatives
    March 22, 2012
    Jerry Wray, Ohio Department of Transportation (ODoT) director, has officially announced the Division of Innovative Delivery, a move he says is critical to identifying innovative and alternative funding solutions and advancing the agency’s goal developing long-term, sustainable solutions to fund future transportation construction projects. By reducing agency costs, commercialising non-interstate rest areas and seeking sponsorship and naming rights for certain infrastructure projects, the Ohio Department of T