Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • How typical?
    July 30, 2012
    Deployment of solar-powered LED road studs has provided significant cost benefits whilst reducing KSIs on notorious routes in South Africa. Can these results be replicated in other regions of the world and on less notorious stretches of road? According to Kevin Adams, Astucia's CEO, they can.
  • ChargeWheel sparks mobile EV charging in San Francisco
    August 16, 2019
    ChargeWheel has secured $1 million in funding to launch a mobile electric vehicle (EV) charging network in the San Francisco Bay Area. The network will be based on ChargeWheel’s mobile Energy Trailers, which don’t require a connection to the grid, and can therefore operate in any car park. The company says they offer a combined solar-powered generation and energy storage solution, and plans to deploy 100 in the Bay Area by the end of 2019. The units can simultaneously charge four EVs or up to 400 elec
  • California traffic deaths drop for fifth consecutive year
    April 20, 2012
    California saw a decline in overall traffic deaths for the fifth year in a row. According to federal government figures, total vehicle fatalities dropped 11.9 per cent, from 3,081 in 2009 to 2,715 in 2010. Since the latest high of 4,333 in 2005, the 2010 figures show a total decline of 37.3 per cent.
  • Fast and efficient barrier-free electronic toll collection
    May 21, 2012
    Canada’s 407 tolled highway allows non-stop travel and a fast and efficient way of paying for it. Ontario’s 407 ETR highway features one of the most advanced barrier-free and all- electronic toll collection systems in the world. The company that operates the road launched the latest phase of its strategy to provide end-to-end automation in summer 2011. A self-service website is now available, allowing users to view and pay charges online using technology supplied by the international market leaders in e-bil