Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • 60% of new cars globally will feature connected car solutions by 2017
    July 4, 2012
    New findings from ABI Research predict that global OEM connected car system penetration will increase from 11.4 per cent in 2012 to 60.1 per cent in 2017. While penetration in the US and Western Europe will exceed 80 per cent by 2017, developing regions such as Latin America and Eastern Europe will also see strong increases in telematics penetration in new vehicles, largely driven by mandates in Brazil and Russia.
  • US trade associations respond to Highway Trust Fund patch
    July 31, 2014
    The International Bridge, Tunnel and Turnpike Association (IBTTA) and the American Road and Transportation Builders Association (ARBTA) have responded to the Senate passage of the Highway and Transportation Funding Act which extends funding for the Highway Trust Fund through May 2015. “Today’s Senate passage of the Highway Trust Fund patch does not negate the need for a long-term solution to our country’s infrastructure funding crisis. Congress must develop a comprehensive plan to address the critical f
  • 5,000-hour durability milestone for transit bus fuel cell system
    February 1, 2012
    UTC Power, a United Technologies Corporation company, has announced one of its latest generation PureMotion Model 120 fuel cell powerplants for hybrid-electric transit buses has surpassed 5,000 operating hours in real-world service with its original cell stacks and no cell replacements.
  • Advanced ITS truck screening aids border control
    March 14, 2012
    State-of-the-art ITS technologies are being deployed for tracking of commercial vehicles at the US-Mexico border in Arizona, reports Pete Goldin. The border between the US and Mexico may be the epitome of America's wild west, but this remote desert frontier is being tamed by the Arizona Department of Transportation (ADOT) with a state-of-the-art ITS system. A comprehensive port-of-entry (POE) screening system is being deployed at the Mariposa Port of Entry – one of the busiest land ports in the nation – at