Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • Slow moving US road user charging programme
    July 18, 2012
    Bern Grush recently attended the Mileage-Based User Fee Conference in Austin Texas where the fledgling American landscape for Road User Charging is beginning to take shape. When I was a kid I liked to poke sticks into the ants' nests in sidewalk cracks. Ants would scatter in every conceivable direction. They ran in circles, they ran over and through each other. They screamed without logic. I was fascinated.
  • Figures show Express Lanes bring wider benefits
    August 12, 2015
    Drivers in the Washington DC area are realising time savings following the opening of Express Lanes on the I-95 - and not only those paying to use the new facility. Washington is ranked as being the worst gridlocked city in the United States. Every day its drivers face an average commute time of 39.5 minutes and they waste an average of 67 hours every year just sitting in traffic. In a move to counter these problems, late last December new Express Lanes were opened along 46.6km (29 miles) of the I-95 betwee
  • IBTTA congratulates Anthony Foxx on his confirmation as DOT Secretary
    June 28, 2013
    The International Bridge, Tunnel and Turnpike Association (IBTTA) congratulated Anthony Foxx after the US Senate voted to confirm him as the next Secretary of the US Department of Transportation. Patrick D Jones, executive director and CEO of the worldwide association representing toll facility owners and operators and the businesses that serve them, said: “IBTTA congratulates Secretary Foxx on his confirmation today as the next US Secretary of Transportation. Secretary Foxx’s leadership comes at a time whe
  • Stage is set for ITS America Annual Meeting
    May 18, 2012
    ITS America has announced that on Monday it will hold a key discussion event concerning intelligent transportation and its role in helping to solve America’s infrastructure crisis with national leaders including Ursula Burns, chairman and CEO of Xerox; Chris Vein, deputy White House chief technology officer; Robert Brown, Ford Motor Company’s VP of sustainability, environment and safety engineering; and Martin Thall, Verizon’s VP - telematics. This is just one of numerous sessions examining ways to bring in