Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • Consortium to study UK eHighway feasibility 
    August 11, 2021
    Partners including Siemens hope overhead electricity lines will serve major roads by 2030s
  • Hello LA! It's showtime!
    September 19, 2022
    Welcome to this year’s ITS World Congress, organised by RX Global. Jaime McAuley, the company’s event director, provides some highlights of what will be an amazing and unforgettable show
  • Johnson Controls says US consumers are interested in start-stop systems
    May 18, 2012
    New consumer research conducted by Johnson Controls claims that 97 per cent of Americans are ready for new start-stop technology that improves the fuel economy of their vehicle. The research was conducted to gain understanding of how consumers view fuel-saving power train technologies based on attributes such as purchase price, fuel economy, annual fuel cost and performance. Focus groups across US major metropolitan areas, along with 1,200 survey respondents, provided feedback on efficient vehicle technolog
  • India to deploy ETC at 82 toll plazas
    September 19, 2014
    Established in 2011, Indian technology and infrastructure company Vaaan has been awarded two major projects valued at around US$25 million from the National Highways Authority of India (NHAI) through its highway operations management agency, Indian Highways Management Company (IHMCL). The company is to deploy electronic toll collection (ETC) on 164 dedicated lanes across 82 public funded toll plazas in a bid to to reduce traffic congestion and commuting time. In addition, in a move to identify which h