Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • Sales of microelectric vehicles will be boosted by 85 per cent by 2013
    May 29, 2012
    Greener agendas, emission-based taxation, parking charge exemptions, and mass-produced electric vehicles are all working together to increase the sales of microelectric vehicles to 0’118,000 units by 2017 within the North American market new analysis from Frost & Sullivan predicts. This represents a compound annual growth rate (CAGR) of 39.30 per cent between 2010 and 2017. By 2013, the total count of microelectric vehicles in North America is likely to increase to 150 types, with the introduction of 34 new
  • Denmark expands EV charging infrastructure
    November 22, 2012
    Denmark’s electric vehicle (EV) charging infrastructure is to be expanded with the installation of fifty smart DC fast chargers. Electric mobility operator Clever has chosen power and automation technology group ABB to supply and maintain the fast chargers throughout Denmark. The companies say the ABB Terra 51 chargers, which are to be installed at strategic locations in the country, are ideally suited for freeway driving and has the capacity to fast charge electric vehicles in a matter of thirty minutes.
  • Milestone for ChargePoint America
    May 16, 2012
    Coulomb Technologies has celebrated a significant milestone for the ChargePoint America programme. At a ceremony in Exposition Park hosted by the Honorable Antonio Villaraigosa, Mayor of Los Angeles. US Energy Secretary Steven Chu and Coulomb Technologies founder and CTO Richard Lowenthal unveiled the 500th ChargePoint America station available now on the ChargePoint Network. Others attending the ceremony included ChargePoint America programme vehicle partners Chevrolet, Ford and smart USA as well as electr
  • Washington State testing Astucia SolarLite road studs
    January 31, 2012
    This weekend, Washington State Department of Transportation (WSDOT) maintenance crews plan to install Astucia SolarLite solar-powered road studs as part of a test project on the centerline of a stretch of SR 530 which has a history of run-off-the-road collisions.