Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

Related Content

  • May 9, 2012
    AeroVironment to supply fast charge systems at Seattle-Tacoma International Airport
    AeroVironment has announced the Port of Seattle has awarded the company a contract valued up to US$8.8 million through 2014 to supply its PosiCharge electric Ground Support Equipment (eGSE) fast charge systems to the Seattle-Tacoma International Airport. “This project will be a tremendous step toward our Century Agenda goal to reduce carbon emissions by 50 per cent from 2005 levels,” said Elizabeth Leavitt, planning and environmental programs director at Seattle-Tacoma International Airport.
  • May 18, 2012
    EVs stir interest but face obstacles – IBM study
    Many automobile industry executives believe that sales of traditional vehicles will peak before 2020 and are looking to electric-only vehicles (EVs) as one of the next hot products, but they will first have to address stringent consumer requirements about EV performance, recharging, and convenience, according to a new IBM survey of consumer attitudes and a recent study of auto industry executives.
  • August 22, 2013
    At-home charging for new Fiat 500e
    Fiat has selected AeroVironment as its preferred provider of home charging stations and installations for its all-electric Fiat 500e. The 2013 Fiat 500e features a 24-kWh Lithium-ion battery that will allow drivers to travel an estimated 108 miles and uses an industry-standard SAE J1772 recharge connector. The 240-volt refuelling station will charge the car in four hours or less versus the approximate twenty hours required using a standard 120-volt charging cable. AeroVironment’s UL-listed station can
  • February 16, 2023
    US announces major EV infrastructure boost
    Biden-Harris Administration says measures mean "great American road trip can be electrified"