Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • Telvent to implement tolling system in three Washington State projects
    July 24, 2012
    Telvent GIT has been selected by the Washington State Department of Transportation (WSDoT) to implement tolling systems through the Washington State Roadway Toll Systems Project. The project includes the implementation, maintenance and operation of three all-electronic tolling systems in the Puget Sound area: the SR-99 bored tunnel in Seattle scheduled to open in 2015, the new SR 520 floating bridge targeted to open in 2014, and the planned I-405 express toll lanes between Bellevue and Lynnwood.
  • Yalla e-mobility for Aljada in UAE
    December 29, 2023
    Arada’s Yalla e-bikes and e-scooters are sustainable transport alternatives in Sharjah, UAE
  • MoDOT to build highway of the future in birthplace of the interstate highway system
    June 3, 2015
    The Missouri Department of Transportation (MoDOT) is soliciting proposals from private industry, entrepreneurs and innovators around the world to use I-70 between Kansas City and St. Louis as a testbed for their ITS solutions. Called Road to Tomorrow, the stretch of the interstate is being dubbed as the highway of the future and is being built at the birthplace of the U.S. Interstate System. Missouri was the first state to begin construction shortly after the 1956 bill was signed into law by President Dwi
  • Congestion charge proposed for Budapest
    May 18, 2012
    The Mayor of Budapest, Istvan Tarlos, has announced that he is planning to introduce congestion charges in the Hungarian capital. The extra funds raised through the measure would be spent on the improvement of public transport services and on providing financial support for the city's public transport firm BKV.