Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • The Ray to advance transport tech in Texas
    April 1, 2021
    Collaboration includes connected and autonomous vehicle infrastructure and electric mobility
  • PTV establishing subsidiary in Mexico
    March 22, 2012
    German software provider PTV AG is opening a new subsidiary, PTV América Latina, with headquarters in Mexico City, to offer cities, engineering offices and universities advanced software solutions and professional consulting services for traffic and transportation planning. The new company will be in charge of opening up new business opportunities in all Spanish-speaking countries in Latin America - from Mexico and the Caribbean countries in the North to Argentina and Chile in the South. PTV's Support Cent
  • Underground DART plan back on track
    May 7, 2014
    Irish Rail is set to proceed with the US$2.8 billion underground second DART rail line through the heart of Dublin city centre, following a recent High Court decision which gave the green light for the project. The line, which would run from Docklands to Inchicore, would complete the trebling of the Greater Dublin area's rail service capacity from 33 million passenger journeys annually now to 100 million passenger journeys upon completion.
  • The case for using toll revenues to fund Interstate improvements
    May 11, 2012
    High road toll increases threaten new regulation, but states should be free to use toll revenue for Interstate improvements. Bob Poole reports Large toll rate increases have been implemented recently by the Port Authority of New York and New Jersey, justified in part to help pay for its World Trade Center project. In response, a bill was introduced in Congress that would allow the Secretary of Transportation to regulate tolls on every bridge on the country’s Interstates and other federally aided highways. F