Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • IDoT launches digital road safety campaign
    July 10, 2012
    Illinois Transportation Secretary Ann L. Schneider has kicked off a statewide digital message board campaign to help reduce roadway fatalities occurring this year. The Illinois Department of Transportation (IDoT) has started to rotate four key traffic safety messages daily starting, in conjunction with a social media and internet page presence. As of July 5, provisional crash data reports 479 fatalities have taken place on Illinois roadways this year, as compared to 418 during the same timeframe last year.
  • The cost benefits of LED traffic signals
    July 16, 2012
    On 11 January 2005, the Kentucky Transportation Cabinet (KYTC) began installing GELcore LED traffic signal modules state-wide through an Energy Savings Performance Contract. In tendering for the work, the energy service contractors could choose any manufacturers equipment but all of them proposed to use the GELcore brand.
  • US budget proposals seek recognise ITS benefits
    April 30, 2015
    President Obama’s latest budget brings some good news for the transportation and ITS sectors. President Obama’s proposed 2016 budget could see more progress on many of America’s ingrained transportation problems than has been achieved in some time and includes a six-year $478 billion surface transportation reauthorisation. That is, of course, provided it clears all of the administrative hurdles to become law.
  • Chargefox to implement EV ultra-rapid charging stations in Australia
    October 26, 2018
    Australian Start-up Chargefox has secured AUS$15 million to build an ultra-rapid network of charging stations for electric vehicles (EV) in the south-eastern state of Victoria. The company says the chargers will allow drivers to travel between major cities. The EV chargers are expected to supply 400km of range in 15 minutes with a power output of up to 350kW. The fund was provided by grants from the Victorian government and the Australian Renewable Energy Agency. It also includes an investment from