Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • Major upgrade for Mississippi bridges
    September 3, 2013
    Four major bridges over the lower Mississippi are to get intelligent transportation systems (ITS) upgrades, thanks to a US$10 million grant from the US Department of Transportation TIGER (Transportation Investment Generating Economic Recovery) fund. The project will expand existing ITS systems in each of the three states to complement previous state and private investments.
  • Emotorwerks Expands in Europe to accelerate Smart-Grid EV Charging
    March 6, 2018
    Internet of Things electric vehicle (EV) charging solution provider, Emotorwerks has expanded its operations to Europe and released its JuiceBox Pro 32 EV charging station to help deliver smart-grid charging capabilities to consumers. It follows the company’s recent acquisition of Enel. JuiceBox Pro 32 will work alongside the Juicenet software platform with the intention of providing drivers with high-powered charging, reliability and smartphone visibility and control over charging. In addition, these
  • Ambitious JV to build CNG stations across the US
    July 26, 2012
    Trillium CNG, a business unit of Integrys Energy Group, and AMP Americas have established a joint venture, AMP Trillium, focused on building a network of CNG stations across the US. Initially, AMP Trillium will construct stations along the I-65 and I-75 trucking corridors and major routes in Texas, with the first station breaking ground towards the end of this year. The stations will be open to the public, though the primary customers will likely be heavy-duty and long-haul trucking fleets.
  • Detroit bridge to 'enhance community connectivity and mobility'
    February 23, 2024
    Gordie Howe International Bridge will link trail systems between Canada and the US