Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • US economic stimulus package highlights ITS technology
    July 17, 2012
    US Secretary of Transportation Ray LaHood talks to ITS International about economic stimulus funding and the absolute need to maintain and increase the use of technology in transportation. Of the total of $787 billion of funding announced under the American Recovery and Reinvestment Act (ARRA), the economic stimulus package which was signed into law by US President Barack Obama on 17 February 2009, $48.1 billion will go to the US Department of Transportation (USDOT). Of that, $27.5 billion is for highway in
  • Renault-Nissan wins 15,000 international vehicle contract with Danone
    July 6, 2012
    The Renault-Nissan Alliance will provide 15,000 vehicles in an exclusive fleet contract with the Paris-based nutritional food company Danone. The first-of-its-kind deal for the Alliance provides a full range of vehicles to Danone in 25 countries for at least five years.
  • PB designing fibre network for MDOT
    April 19, 2012
    The Michigan Department of Transportation (MDOT) has awarded a contract to Parsons Brinckerhoff (PB) for the design of a new fibre-optic communications network in metropolitan Detroit. The project is a multi-phase effort to build an MDOT-owned fibre-optic network for communications with the Detroit region’s intelligent transportation system deployment, including hundreds of closed-circuit television cameras, dynamic message signs and vehicle detection systems along regional freeways.
  • Report forecasts rapidly changing market for drones
    February 19, 2015
    A new IDTechEx report, Electric Drones: Unmanned Aerial Vehicles UAVs 2015-2025, examines the market for drones or unmanned aerial vehicles (UAVs), saying that most of the market value today lies in military applications, both for electric and - the big money - non-electric versions. Nonetheless, small UAVs are increasing in sales fastest and that is primarily down to non-military applications. From 2026, civil uses will greatly exceed military in market value. The report forecasts it all but concentrates o