Skip to main content

Another section of West Coast Green Highway EV charging infrastructure announced

The Washington State Department of Transportation (WSDOT) has selected AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.
April 19, 2012 Read time: 2 mins
RSSThe 451 Washington State Department of Transportation (WSDOT) has selected 2132 AeroVironment to manufacture, supply, install and operate a network of nine fast-charging stations for electric vehicles on Interstate 5 and US 2. Stations will be located every 40 to 60 miles along stretches of I-5 between the Canadian border and Everett and between Olympia and the Oregon border, as well as along US 2 between Everett and Leavenworth.

“A network of charging stations linking Washington to Oregon and Canada will make electric vehicles more attractive to consumers and businesses, and transportation better for the environment,” said Paula Hammond, Washington secretary of transportation.

The fast-charging stations will be operational by the end of November and will power an electric vehicle from zero to fully charged in less than 30 minutes. Each station also will include a Level 2 “medium-speed” charging station, which will cost less for users and take up to four to six hours for a full charge. The stations will be located at private retail locations such as shopping malls, fuelling stations and travel centres with easy access to the highway.

In the area between Everett and Olympia, additional charging stations will be installed through a federal programme, The EV Project, administrated by the US Department of Energy. Combined, the two projects will connect Washington drivers along the entire 450kms of I-5 between Canada and Oregon.

While AeroVironment helps power the electric-vehicle charging network in Washington, the company will simultaneously electrify I-5 in Oregon through a similar project managed by the Oregon Department of Transportation. Both states’ projects will complement The EV Project, which will install thousands of home and public electric-vehicle charging stations in six states, including Washington, Oregon and California.

Washington’s electric-highway infrastructure is a key component of a future West Coast Green Highway. When complete, it will extend a seamless network of recharging stations along all 2,200 kms of I-5 from Canada to Mexico, serving more than two million electric vehicles that market analysts say will be sold in Washington, Oregon and California in the next decade.

For more information on companies in this article

Related Content

  • Installed base of fleet management systems in Europe to reach 10.6 million by 2020
    August 26, 2016
    The number of active fleet management systems deployed in commercial vehicle fleets in Europe was 5.3 million in Q4-2015, according to a new research report from the M2M/IoT analyst firm Berg Insight. Growing at a compound annual growth rate (CAGR) of 14.9 percent, this number is expected to reach 10.6 million by 2020. All the top-10 vendors have today more than 100,000 active units in Europe. TomTom’s subscriber base has grown both organically and by acquisitions during the past years and the company ha
  • US DOTs introduce measures to stop wrong-way driving
    March 28, 2018
    Wrong-way driving (WWD) is a remarkably innocuous term for incidents that all too often cause some of the worst accidents that emergency services have to deal with. Several US states are now taking steps to minimise the problem, as Alan Dron finds out. You’re driving down a highway at night when you see approaching headlights. You initially assume they are merely those of an oncoming car on the opposite carriageway. It’s only when they are within 200 yards or so that you realise that the other driver is in
  • Technology overcomes EV range challenges
    February 4, 2013
    According to new analysis from Frost and Sullivan, Strategic Analysis of Global Market for Range Extenders, major challenges currently faced by the electric vehicle (EV) revolve around the inability to provide long range in a single charge as well as the lengthy charging times that can vary from thirty minutes to ten hours. This has limited the number of adopters for EVs. Range extender technology overcomes these challenges, strategically positioned to make strong gains in the EV market. Currently, the mark
  • Oregon trials road user charging
    February 11, 2013
    In Oregon, gas-tax money funds about 58 per cent of the budget used to take care of the state’s roads. As vehicles become more fuel efficient, the gas tax, which is 30 cents a gallon in Oregon and 37 cents in Washington, will generate less and less money. “If we’re using gasoline and diesel sales to fund our transportation system, we’re going to be in big trouble,” said Patrick Cooney of the Oregon Department of Transportation (ODOT). Recognizing the problem early, Oregon started studying alternatives to th