Skip to main content

Analysis reveals increase in UK government infrastructure and construction pipeline

Analysis by KPMG has revealed a US$49 billion (£38.9 billion) jump in the value of the UK Government infrastructure and construction pipeline since March 2016. It also revealed that 60 per cent of the US$633.8 billion (£502.3 billion) in pipeline value is predicted to be spent by 2020. The report, National Infrastructure and Construction Pipeline – KPMG Analysis, reflects a total allocated value of US$633.8 billion (£502.3 billion), from US$584.6 billion (£463.4 billion) in March 2016. It highlights t
December 9, 2016 Read time: 2 mins
Analysis by 1981 KPMG has revealed a US$49 billion (£38.9 billion) jump in the value of the UK Government infrastructure and construction pipeline since March 2016. It also revealed that 60 per cent of the US$633.8 billion (£502.3 billion) in pipeline value is predicted to be spent by 2020.

The report, National Infrastructure and Construction Pipeline – KPMG Analysis, reflects a total allocated value of US$633.8 billion (£502.3 billion), from US$584.6 billion (£463.4 billion) in March 2016.

It highlights that the largest changes in the pipeline are due to an increase in housing and regeneration, including new spend around Accelerated Build, Affordable Housing and Housing Infrastructure fund programmes. Investment into communications, of which 75 per cent is allocated to the Digital Economy is also highlighted as a reason for the increase
 
Allocated investment into energy, transport and utilities has remained largely consistent since the last pipelines first, second and third highest spends respectively). Combined they make up a total of 84 per cent of the total pipeline, accounting to US$528 (£419 billion) in value.
 
Overall, 65 per cent of spend is attributed to projects that benefit the whole of the UK (US$411 billion (£326 billion)) followed by the South at US$91 billion (£71.9 billion) and then the North at US$60.3 billion (£47.8 billion). Spend per capita suggests equal funding per person between North and South.
 
Richard Threlfall, KPMG’s UK head of Infrastructure, Building and Construction said: “This is the first time the Government has produced a combined infrastructure and construction pipeline. Our analysis confirms that there has been a significant increase in the value of that pipeline, and that energy and transport remain the biggest sectors and hence provide the best opportunities in the UK market. I expect infrastructure investors and the construction industry will both welcome having a comprehensive view of the spending plans of Government and utilities, covering both social and economic infrastructure.”

Related Content

  • October 23, 2017
    UK Government announces funding for Smart Mobility Lab in London
    A consortium led by TRL has been awarded £13.4 million ($10.1 million) of the UK government's £51 million ($38 million) Connected and Autonomous Vehicle (CAV) testbed funding to create a Smart Mobility Living Lab (SMLL) in Greenwich and nearby Queen Elizabeth Olympic Park, Stratford, London. The funding is part of the £100 million ($75 million) UK CAV test bed competitive fund and is the first investment by government and industry through Meridian to develop a national CAV testing infrastructure.
  • April 16, 2014
    Sydney to get second airport, major roads package
    Following the announcement of the US$2.4 billion project to build a long-awaited second airport for Sydney, Australian prime minister Tony Abbott has unveiled a US$3.27 billion roads package for western Sydney to provide the infrastructure that will make the airport work. The Commonwealth will contribute US$1.2 billion for the roads over the next four years, with total spending to increase to US$2.9 billion over eight years. New South Wales will contribute a further 20 per cent, bringing the total fundin
  • June 25, 2018
    Cost benefit analysis ‘can’t be carried out with a cookbook’
    There is far more to working out the worth of a project than simply filling in a few headings on a spreadsheet. David Crawford surveys some recent thinking from the US and Canada. Cost benefit analysis (CBA) “can’t be carried out with a cookbook”, warns US analyst Professor Robert J Brent. “ You can’t just get out a spreadsheet and fill in the data for all the headings. Each transport CBA should have something that is distinctive, in terms of location (for example, for a rural area), types of user
  • November 13, 2012
    Ukraine, Poland ‘boast the most modernised infrastructure in eastern Europe’
    Preparations for hosting the major sporting event, the Euro 2012 European football championship, enabled Ukraine and Poland to give their infrastructure the biggest facelift in the region and beyond. While three-quarters of Poland's expenditure was covered by EU funds, Ukraine financed the building of roads, hotels, and airports itself. Ukraine, however, did receive a EUR 2.2 billion loan from the European Bank for Reconstruction and Development (EBRD). "The infrastructure sector will definitely remain one