Skip to main content

Alstom-led consortium to deliver driverless light metro system to Montreal

An Alstom-led consortium has joined forces with Caisse de Dépôt et Placement du Québec subsidiary DCPQ Infra to deliver an automatic and driverless light metro system for the Réseau Express Métropolitain (REM) project in Montreal, Canada. Alstom will introduce train and signalling solutions to help maximise system reliability, performance, capacity and passenger experience. The consortium, called Groupe des Partenaires pour la Mobilité des Montréalais (Groupe PMM), is also working with Surveyer Nenniger
April 17, 2018 Read time: 2 mins
An 8158 Alstom-led consortium has joined forces with Caisse de Dépôt et Placement du Québec subsidiary DCPQ Infra to deliver an automatic and driverless light metro system for the Réseau Express Métropolitain (REM) project in Montreal, Canada. Alstom will introduce train and signalling solutions to help maximise system reliability, performance, capacity and passenger experience.

 
The consortium, called Groupe des Partenaires pour la Mobilité des Montréalais (Groupe PMM), is also working with Surveyer Nenniger & Chênevert ( SNC-Lavalin) in a contract worth around $2.8bn (£1.5bn). Alstom's share of this is estimated at $2.2bn (£1.21bn) and SNC-Lavalin's is $600m (£332m).
 
Once completed, REM will be 67km long with 26 stations that connect Montreal to the South Shore, the North Shore, the West Island and Pierre Elliot Trudeau International Airport.
 
Groupe PMM will deliver 212 Alstom Metropolis metro cars, Alstom’s Urbalis 400 driverless and automated communications-based train control and Iconis control centre solutions, as well as platform screen doors, Wi-Fi connectivity and 30 years of operations and maintenance services. In addition, the consortium will manage train and system integration tests and depot equipment supply for train maintenance.
 
Alstrom will also create a global centre of excellence in Montreal for the research and development of integrated systems of control in urban mobility. The facility will bring together around 100 professionals who will collaborate on developing solutions to be used in company projects worldwide.
 
Commercial service on the first segment of REM is expected in summer 2021.

Related Content

  • July 31, 2012
    Dubai metro - the world's longest automated rail system
    David Crawford reviews the recent opening of Dubai's Red Line. The US$7.6bn Dubai Metro, the Phase I Red Line of which started partial operation in September 2009, will be the world's longest driverless rail system on its planned completion in 2011. With a total length of some 75km, it will then overtake the 68.7km Vancouver SkyTrain and be able to carry over 1.2 million passengers on a typical day.
  • October 20, 2015
    Thales consortium to provide systems for Panama metro line 2
    A consortium comprising Thales Alstom, CIM, Sofratesa, and TSO by Consórcio Línea 2 (Odebrecht and FCC) has been awarded a US$ 568 million contract for the provision of an integrated metro system for line 2 of the Panama metro network. Thales will deliver its transportation solutions in telecommunication, passenger services, security and supervision systems. Scheduled to begin in 2019, line 2 will be 21 km long and include 16 stations. It will interconnect with line 1, inaugurated in 2014 and for whic
  • February 5, 2016
    International consortium to deliver Canberra’s light rail network
    The first stage of Canberra’s light rail network will be constructed by the Canberra Metro consortium, comprising of Pacific Partnerships, CPB Contractors, John Holland, Mitsubishi Corporation, Aberdeen Infrastructure Investments, Deutsche Bahn International and CAF. Between them they will deliver on 12km of light rail track, 13 stops, 14 light rail vehicles, a depot and 20 years of operation and maintenance. Canberra Metro will construct and operate stage one of Canberra’s light rail from Gungahlin
  • September 7, 2015
    Indra to implement ticketing technology for new Algerian trolley line
    Alstom Transport has awarded Indra a US$3 million contract to develop and implement the ticketing systems for the first trolley line currently under construction in the Algerian city of Setif. With a total length of 22.2 kilometres, the Setif trolley line project is being undertaken by Entreprise du Métro d’Alger (EMA), which has subcontracted the construction to Alstom Transport and the construction company Yapi Merkezi. Indra will supply ticketing systems for the 27 stations and four interchanges p