Skip to main content

Alstom to implement new Swedish railway traffic control centre

Swedish transport administration Trafikverket has awarded Alstom a contract worth US$73.5 million to implement the Iconis railway control centre solution. The new traffic management system will cover the entire country and forms part of a broader project by Trafikverket to improve the punctuality and capacity of its network. The scope of the contract, which will run for eight years with an additional nine-year option, also covers the development and maintenance of the system. Alstom’s Iconis Mainline con
October 1, 2015 Read time: 1 min
746 Swedish transport administration Trafikverket has awarded Alstom a contract worth US$73.5 million to implement the Iconis railway control centre solution. The new traffic management system will cover the entire country and forms part of a broader project by Trafikverket to improve the punctuality and capacity of its network. The scope of the contract, which will run for eight years with an additional nine-year option, also covers the development and maintenance of the system.

Alstom’s Iconis Mainline control centre solution integrates information, monitoring, control and optimisation of the entire rail network, allowing for traffic disturbances, management and resource allocation.

Alstom’s solution combines the reliability of a standardised product with the necessary flexibility for future evolution. Iconis is a highly configurable product based on open integration technologies that can be adapted to customer requirements and which accommodates changes and additional features.

For more information on companies in this article

Related Content

  • Gothenburg’s year of congestion charging
    April 9, 2014
    A year after it went live, Colin Sowman examines the technology used for Gothenburg’s congestion charging system and the effect the scheme has had on commuters. When it comes to long-term planning, the Scandinavians take some beating.The West Swedish Agreement is a case in point. Introduced in 2009, the Agreement runs through to around 2027 and aims to create an attractive, sustainable and growing region, and over that timescale the number of journeys is expected to increase by a third. Therefore the Agreem
  • Camera technology a flexible and cost-effective option
    June 7, 2012
    Perceptions of machine vision being an expensive solution are being challenged by developments in both core technologies and ancillaries. Here, Jason Barnes and David Crawford look at the latest developments in the sector. A notable aspect of machine vision is the flexibility it offers in terms of how and how much data is passed around a network. With smart cameras, processing capabilities at the front end mean that only that which is valid need be communicated back to a central processor of any descripti
  • Green requirements of traffic video systems
    February 2, 2012
    Traficon's Head of Product and Application Management Robin Collaert offers up a discussion of the likely future green requirements of traffic video systems. At the most basic levels, ITS has the potential to significantly reduce the amounts of time which vehicles spend waiting at intersections, and less time spent waiting means less in the way of vehicular emissions. All of that will hardly come as news to most laypeople, let alone transport professionals. However, the reality is that even today too many r
  • Turkmenistan railways modernise with Huawei GSM-R
    June 12, 2014
    Huawei is to supply its GSM-R solution for the Turkmenistan Buzhun-Serehtyaka and Bereket-Cilmammet integrated railway communications project. Huawei's customised solution features advanced communication technologies and equipment for the railway industry, including the DBS3800 distributed base stations and remote radio units (RRUs) which are installed at the top of towers, efficiently reducing the impact of antenna feeder loss on radio network coverage while satisfying the special local requirement that