Skip to main content

Alstom consortiums awarded contracts for Cairo metro line 3

Alstom has signed two contracts with Egypt’s National Authority for Tunnels (NAT) to supply the signalling system in a consortium with Thales and, in partnership with Colas Rail, Orascom and ARABCO, the infrastructure of the phase 4A of Cairo metro line 3, currently under construction. Alstom’s shares in these contracts are worth around US$96 million. Cairo’s metro currently carries three million passengers per day and this is expected to reach five million by 2020. Its network includes two fully operationa
March 10, 2015 Read time: 2 mins
RSSAlstom has signed two contracts with Egypt’s National Authority for Tunnels (NAT) to supply the signalling system in a consortium with Thales and, in partnership with Colas Rail, Orascom and ARABCO, the infrastructure of the phase 4A of Cairo metro line 3, currently under construction. Alstom’s shares in these contracts are worth around US$96 million.

Cairo’s metro currently carries three million passengers per day and this is expected to reach five million by 2020. Its network includes two fully operational lines and a third line, partially opened, whose construction is being carried out in different phases. Phase 4A of line 3, which covers 5.7 km and comprises five stations, will be completed in early 2018.

For phase 4A of Cairo metro line 3, Alstom will provide its Urbalis 200 signalling system as well as points machines and station signalling equipment. The company will also provide electromechanical equipment including power supply to feed the third rail, ventilation system and elevators/escalators. With this extension, the line will carry over 750,000 passengers per day in total safety.

“We are pleased that NAT has entrusted Alstom with these new contracts. This is a continuing partnership that was initiated more than 30 years ago. NAT can be reassured of Alstom’s engagement to further develop Cairo’s metro network”, said Gian-Luca Erbacci, senior vice-president of Alstom Transport for Middle East and Africa.

Related Content

  • December 13, 2013
    CAF-Thales consortium wins Chile metro contract
    In a contract worth US$451.9 million, a consortium of CAF and Thales will supply Santiago’s metro operator with CAF trains controlled by Thales’ communication based train control (CBTC) system for lines 3 and 6 of the metro. The contract also includes a 20-year maintenance agreement. Thales will supply its fully automatic Seltrac CBTC solution, enabling the metro operator to increase the frequency of train services and passenger capacity. This is boosted by CAF’s new energy efficient rail cars, which of
  • April 25, 2012
    Systra wins Bagdad underground metro contract
    During a visit to Paris, a delegation from the Bagdad Mayoralty in Paris has signed a contract with Systra for the design and tender services for the Bagdad Underground Metro Lines 1 and 2, which are intended to be the backbone of future transport development in the Iraqi capital. Systra’s contract involves the basic design, preparation of tender documents, and selection of EPC Contractor for two underground metro lines.
  • June 14, 2018
    Keeping people on track is RATP’s raison d’etre
    In Paris, RATP Group’s autonomous Metro Line 1 is carrying 750,000 people a day across the city. Ben Spencer is invited into the control room to take a look at how the system works Paris is visited by millions of tourists each year, keen to see for themselves stunning attractions such as the Eiffel Tower, Arc de Triomphe, Notre-Dame, the Louvre, the Seine and all the rest. But while the best-known sites of the City of Light tend to be on the surface, there is a lot going on below those iconic grand boule
  • November 30, 2015
    Indra wins in India with two transport and traffic contracts
    Indra has increased its penetration of the Indian transport and traffic by winning two contracts with a total value of US$12.5 million to deploy its technology in the longest tunnel in Southeast Asia, between Chenani and Nashri, and in the Navi Mumbai metro system, in India's financial capital, both currently under construction. Under the first contract, Indra is responsible for the design, supply, set-up and rollout of the control system for the 9.2 km long tunnel and will equip the control center with