Skip to main content

Alstom consortiums awarded contracts for Cairo metro line 3

Alstom has signed two contracts with Egypt’s National Authority for Tunnels (NAT) to supply the signalling system in a consortium with Thales and, in partnership with Colas Rail, Orascom and ARABCO, the infrastructure of the phase 4A of Cairo metro line 3, currently under construction. Alstom’s shares in these contracts are worth around US$96 million. Cairo’s metro currently carries three million passengers per day and this is expected to reach five million by 2020. Its network includes two fully operationa
March 10, 2015 Read time: 2 mins
RSSAlstom has signed two contracts with Egypt’s National Authority for Tunnels (NAT) to supply the signalling system in a consortium with Thales and, in partnership with Colas Rail, Orascom and ARABCO, the infrastructure of the phase 4A of Cairo metro line 3, currently under construction. Alstom’s shares in these contracts are worth around US$96 million.

Cairo’s metro currently carries three million passengers per day and this is expected to reach five million by 2020. Its network includes two fully operational lines and a third line, partially opened, whose construction is being carried out in different phases. Phase 4A of line 3, which covers 5.7 km and comprises five stations, will be completed in early 2018.

For phase 4A of Cairo metro line 3, Alstom will provide its Urbalis 200 signalling system as well as points machines and station signalling equipment. The company will also provide electromechanical equipment including power supply to feed the third rail, ventilation system and elevators/escalators. With this extension, the line will carry over 750,000 passengers per day in total safety.

“We are pleased that NAT has entrusted Alstom with these new contracts. This is a continuing partnership that was initiated more than 30 years ago. NAT can be reassured of Alstom’s engagement to further develop Cairo’s metro network”, said Gian-Luca Erbacci, senior vice-president of Alstom Transport for Middle East and Africa.

Related Content

  • MasterCard and Cubic join forces on smart city payment solutions
    March 4, 2015
    MasterCard today is to partner with Cubic Transportation Systems, combining MasterCard’s everyday payments and loyalty management expertise with Cubic’s NextCity platform to develop solutions that: Enable transportation operators to offer flexible pricing based on system demand; Provide individual travellers with real-time guidance on their mobile devices on the smartest way to travel, offering fare incentives if the system becomes congested or overcrowded; Offer retailers at and around transportation hu
  • Kapsch offers improved cab radios for railway communications
    September 18, 2014
    Kapsch CarrierCom, in partnership with Sierra Wireless, has launched two improved railway cab radios. The RC900 voice and data cab radio and the RD900 data radio are equipped with the latest Sierra Wireless HPRM1radio modules called, which ensure additional robustness against unwanted radio interference and blocking. A stable radio connection is an essential requirement for the railway system. Due to the growing networks of public operators, more and more interference is affecting the communication withi
  • B&C Transit modernises Miami-Dade Metrorail’s control systems
    June 1, 2016
    Jason Gomez and Daniel Mondesir describe how passenger disruption was minimised during a major upgrading of the control room of Miami-Dade’s Metrorail. In 1984 when the Miami-Dade Department of Transportation and Public Works’ (DTPW) Metrorail system was launched in southern Florida, trains ran 18km along a single line and stopped at 10 stations.
  • Colombian highway sees ITS tested to the extreme
    November 13, 2014
    One of the most challenging road construction and ITS projects currently underway is the upgrading of the road from Bogota to Villavicencio. Currently it takes four hours to make the 86km journey between Bogota and Villavicencio using the existing single lane in each direction road which passes through some very challenging terrain. It is the only ground connection between central Colombia and the eastern region which represents 40% of the country’s territory.