Skip to main content

Alstom chooses GMV for Sydney’s new light rail system

Technology company GMV has been chosen by Alstom to supply an advanced fleet management system with in-station passenger information for the new light rail system being built by the ALTRAC consortium of Alstom, rail operator Transdev, Acciona and Capella in Sydney, Australia. Alstom is responsible for the integrated tramway system for the 12 kilometre line, including the design, delivery and commissioning of 30 coupled Citadis X05 trams It will also provide the power supply equipment, including APS gr
April 13, 2016 Read time: 2 mins
Technology company 55 GMV has been chosen by 8158 Alstom to supply an advanced fleet management system with in-station passenger information for the new light rail system being built by the ALTRAC consortium of Alstom, rail operator Transdev, Acciona and Capella in Sydney, Australia.

Alstom is responsible for the integrated tramway system for the 12 kilometre line, including the design, delivery and commissioning of 30 coupled Citadis X05 trams It will  also provide the  power supply equipment, including APS ground power supply over two kilometres, signalling systems, HESOP energy recovery system, depot equipment and maintenance.

GMV’s system will be based on its SAE-R railway and tram fleet management system, which can be integrated with external control systems such as SCADA and TETRA systems and the planning and analysis tools used by Transport for NSW, as well as the TCMS, CAPSYS, passenger information and TETRA systems  inside the tram cars.

The solution combines the normal functions of systems such as centralised fleet tracking, management of messaging and voice communications between trams and control centre (on TETRA/Wi-Fi), plus service regulation operations with other recently grafted-on functions like dynamic route establishment.

All the trams will be fitted with onboard units (OBUs) and touch screens in both cabs for driver interaction. The whole system is rounded out with the installation of a control centre comprising a set of servers in a virtualised environment and a series of workstations that will allow Transdev to ensure smooth service operation.

The stations will be fitted with LED information panels to provide passengers with arrival and departure information, service level, service notices, etc.

For more information on companies in this article

Related Content

  • GMV demonstrates plug and play windshield OBU
    July 31, 2015
    Among a range of products being highlighted by Spain-headquartered GMV, a global technology company with a high level of specialisation in ITS for transport and mobility, will be the U10-T Onboard Unit, a reliable OBU designed according to European Standards to provide all on-board functionalities required for GNSS-based Electronic Fee Collection. U10-T is designed to support both thin and thick architectures and is compatible with EETS. The unit integrates a DSRC module (5.8 GHz) that can be used for enfor
  • Israel Railways deploys train planning system
    February 9, 2015
    Israel Railways is to use HaCon’s train planning system, TPS, for its train planning and capacity management, including all schedules and route inquiries for passenger and freight traffic. The rail operator aims to fully replace its legacy tools and systems with TPS by the end of the year. The contract also includes HAFAS components for timetable publishing. Israel Railways acts as both infrastructure manager and train operator, with 2,370 employees and a network of approximately 1,100 kilometres of tr
  • Cubic’s NextBus Subsidiary seals real time bus arrival deal
    October 23, 2014
    Cubic Transportation Systems subsidiary NextBus is expanding its market with its first real-time passenger information systems (RTPIS) project outside North America, with TransLink, the public transportation provider in south east Queensland, Australia.
  • Microgrids & the new power generation
    August 31, 2021
    Public transportation agencies are turning to microgrids to provide critical resilience in the event of local and regional power interruptions. Gordon Feller looks at projects in Maryland, New Jersey and Massachusetts