Skip to main content

Alstom chooses GMV for Sydney’s new light rail system

Technology company GMV has been chosen by Alstom to supply an advanced fleet management system with in-station passenger information for the new light rail system being built by the ALTRAC consortium of Alstom, rail operator Transdev, Acciona and Capella in Sydney, Australia. Alstom is responsible for the integrated tramway system for the 12 kilometre line, including the design, delivery and commissioning of 30 coupled Citadis X05 trams It will also provide the power supply equipment, including APS gr
April 13, 2016 Read time: 2 mins
Technology company 55 GMV has been chosen by 8158 Alstom to supply an advanced fleet management system with in-station passenger information for the new light rail system being built by the ALTRAC consortium of Alstom, rail operator Transdev, Acciona and Capella in Sydney, Australia.

Alstom is responsible for the integrated tramway system for the 12 kilometre line, including the design, delivery and commissioning of 30 coupled Citadis X05 trams It will  also provide the  power supply equipment, including APS ground power supply over two kilometres, signalling systems, HESOP energy recovery system, depot equipment and maintenance.

GMV’s system will be based on its SAE-R railway and tram fleet management system, which can be integrated with external control systems such as SCADA and TETRA systems and the planning and analysis tools used by Transport for NSW, as well as the TCMS, CAPSYS, passenger information and TETRA systems  inside the tram cars.

The solution combines the normal functions of systems such as centralised fleet tracking, management of messaging and voice communications between trams and control centre (on TETRA/Wi-Fi), plus service regulation operations with other recently grafted-on functions like dynamic route establishment.

All the trams will be fitted with onboard units (OBUs) and touch screens in both cabs for driver interaction. The whole system is rounded out with the installation of a control centre comprising a set of servers in a virtualised environment and a series of workstations that will allow Transdev to ensure smooth service operation.

The stations will be fitted with LED information panels to provide passengers with arrival and departure information, service level, service notices, etc.

Related Content

  • Victorian government to implement high capacity signalling on new rail line
    July 18, 2017
    The Victorian government, Australia has awarded CPB Contractors and Bombardier Transportation the contract to deliver the US$790 million (AU$1 billion) Rail Systems Alliance in Melbourne, which includes the roll-out of a 55 kilometre long high capacity signalling (HCS) and communications system. HCS allows trains to safely run closer together, meaning they can run more often. The technology will enable trains every two to three minutes, creating a ‘turn-up-and-go’ train network for Melbourne. The signalling
  • Vitronic to supply Netherlands truck toll observation system
    July 12, 2024
    From 2026, truck owners will pay a fee based on kilometres driven on highways
  • Gruppo Torinese Trasporti chooses Papercast for bus stop display system, Turin
    October 18, 2017
    Transport company Gruppo Torinese Trasporti (GTT) has chosen Papercast’s solar solar-powered e-paper bus stop display system, which uses E-ink technology, to replace the current LCD based passenger information system in Turin, Italy. The programme is part of a City-wide programme to improve the quality of information provided to passengers at bus stops with a self-sustainable solution.
  • Hungary to get real-time passenger information system
    February 13, 2013
    T-Systems Hungary has been awarded a contract by Hungarian public transport operator Kaposvari Tomegkozlekedesi to set up a new passenger information system in the municipality of Kaspovar. The project includes the installation of passenger information displays including 41 solar-powered units at bus stops, wi-fi hotspots, and a new real-time GPS tracking system. Bus arrival times will be displayed on the passenger information displays, including information on the arrival of low-floor buses for the disabl