Skip to main content

Alstom chooses GMV for Sydney’s new light rail system

Technology company GMV has been chosen by Alstom to supply an advanced fleet management system with in-station passenger information for the new light rail system being built by the ALTRAC consortium of Alstom, rail operator Transdev, Acciona and Capella in Sydney, Australia. Alstom is responsible for the integrated tramway system for the 12 kilometre line, including the design, delivery and commissioning of 30 coupled Citadis X05 trams It will also provide the power supply equipment, including APS gr
April 13, 2016 Read time: 2 mins
Technology company 55 GMV has been chosen by 8158 Alstom to supply an advanced fleet management system with in-station passenger information for the new light rail system being built by the ALTRAC consortium of Alstom, rail operator Transdev, Acciona and Capella in Sydney, Australia.

Alstom is responsible for the integrated tramway system for the 12 kilometre line, including the design, delivery and commissioning of 30 coupled Citadis X05 trams It will  also provide the  power supply equipment, including APS ground power supply over two kilometres, signalling systems, HESOP energy recovery system, depot equipment and maintenance.

GMV’s system will be based on its SAE-R railway and tram fleet management system, which can be integrated with external control systems such as SCADA and TETRA systems and the planning and analysis tools used by Transport for NSW, as well as the TCMS, CAPSYS, passenger information and TETRA systems  inside the tram cars.

The solution combines the normal functions of systems such as centralised fleet tracking, management of messaging and voice communications between trams and control centre (on TETRA/Wi-Fi), plus service regulation operations with other recently grafted-on functions like dynamic route establishment.

All the trams will be fitted with onboard units (OBUs) and touch screens in both cabs for driver interaction. The whole system is rounded out with the installation of a control centre comprising a set of servers in a virtualised environment and a series of workstations that will allow Transdev to ensure smooth service operation.

The stations will be fitted with LED information panels to provide passengers with arrival and departure information, service level, service notices, etc.

Related Content

  • November 6, 2015
    GE and Deutsche Bahn partnership to optimise rail operations
    GE and Deutsche Bahn Energie (DB Energie) are partnering to optimise Deutsche Bahn’s rail network’s power supply. Working with DB Energie, GE Energy Management will provide the technology and expertise that will couple energy fed from the utility grid to the rail grid, ensuring a more efficient and constant power supply. The solution ensures efficient power conversion and high power quality, optimising rail system operations. Scheduled for delivery between 2017 and 2018, the converter station built by G
  • December 12, 2014
    Cubic completes Sydney Opal Card rollout early
    Cubic Transportation Systems has completed the roll out of Sydney’s Opal contactless smartcard ticketing system across all transport modes and connecting multiple operators and commenced operation and maintenance of the Opal system under the ten-year services agreement that is part of the original contract. The contract to build the new electronic ticketing system (ETS) – later branded as the Opal Card – was awarded to the Cubic-led Pearl consortium in 2010.
  • December 20, 2012
    Integrated passenger transport system for Luxembourg
    Luxembourg’s integrated passenger transport system is to benefit from a new system for control, passenger information and electronic fare collection (e-ticketing). Init has been awarded a contract by the Luxembourg transport association to equip thirty-four private and three public transport companies with the system over the next three years. The contract also includes control centres and providing around 920 vehicles with hardware and software.
  • December 4, 2012
    Success of London's Olympic public transport systems
    The Olympic flame has moved on, allowing review of the relative degrees of London’s 2012 transportation success, how it was done and with what lasting effects. Jon Masters reports. This magazine’s international position provides a good vantage point for assessing impressions left by London’s 2012 Olympic Games. On the whole, it has been only praise and congratulations heard since the closing ceremonies of the Olympic Games in August and the Paralympics in September. The events looked great and ran smoothly