Skip to main content

Alstom chooses GMV for Sydney’s new light rail system

Technology company GMV has been chosen by Alstom to supply an advanced fleet management system with in-station passenger information for the new light rail system being built by the ALTRAC consortium of Alstom, rail operator Transdev, Acciona and Capella in Sydney, Australia. Alstom is responsible for the integrated tramway system for the 12 kilometre line, including the design, delivery and commissioning of 30 coupled Citadis X05 trams It will also provide the power supply equipment, including APS gr
April 13, 2016 Read time: 2 mins
Technology company 55 GMV has been chosen by 8158 Alstom to supply an advanced fleet management system with in-station passenger information for the new light rail system being built by the ALTRAC consortium of Alstom, rail operator Transdev, Acciona and Capella in Sydney, Australia.

Alstom is responsible for the integrated tramway system for the 12 kilometre line, including the design, delivery and commissioning of 30 coupled Citadis X05 trams It will  also provide the  power supply equipment, including APS ground power supply over two kilometres, signalling systems, HESOP energy recovery system, depot equipment and maintenance.

GMV’s system will be based on its SAE-R railway and tram fleet management system, which can be integrated with external control systems such as SCADA and TETRA systems and the planning and analysis tools used by Transport for NSW, as well as the TCMS, CAPSYS, passenger information and TETRA systems  inside the tram cars.

The solution combines the normal functions of systems such as centralised fleet tracking, management of messaging and voice communications between trams and control centre (on TETRA/Wi-Fi), plus service regulation operations with other recently grafted-on functions like dynamic route establishment.

All the trams will be fitted with onboard units (OBUs) and touch screens in both cabs for driver interaction. The whole system is rounded out with the installation of a control centre comprising a set of servers in a virtualised environment and a series of workstations that will allow Transdev to ensure smooth service operation.

The stations will be fitted with LED information panels to provide passengers with arrival and departure information, service level, service notices, etc.

For more information on companies in this article

Related Content

  • Electreon completes first US dynamic charging project
    December 8, 2023
    Testing of inductive charging technology along the Detroit road will start next year
  • Moscow Ring Railway upgraded to GSM-R
    September 23, 2016
    Austrian companies Rotek and Frequentis have completed the deployment of Global System for Mobile Communications – Railway (GSM-R) standard dispatch communication equipment for the Moscow Ring Railway (MRR) on behalf of JSC Russian Railways. Based on Frequentis IP voice communication technology, Rotek upgraded the current system and connected it to the infrastructure and terminals of the MRR. GSM-R functionality supports further planned rail extensions including additional Russian Railway lines as we
  • SESA commissions first full colour walk-in DMS in Rhode Island
    July 10, 2015
    SES America, under contract with the Rhode Island Airport Corporation (RIAC), has successfully installed and commissioned the first full colour walk-in dynamic message sign in the state of Rhode Island. The sign is part of SESA’s Messenger 6000 family of highly energy efficient signs and will be used by the Airport Corporation to display information related to airport traffic, parking and public advisories. With its large size, high resolution, and ability to display both text and graphics, the sign will im
  • Vital Technology data comms network deployed at Dublin Port Tunnel
    July 13, 2012
    Vital Technology has supplied a data communications network system to Egis Road & Tunnel Operation Ireland (ERTO) for the Dublin Port Tunnel which opened to traffic in 2007 and is the longest urban tunnel in Europe as well as the largest civil engineering project ever undertaken in Ireland. While core components are proving durable, communication systems became subject to early obsolescence and were causing networking problems and unscheduled closures which prompted the upgrade.