Skip to main content

Alpha release of (SET-IT) software

The USDOT's Intelligent Transportation Systems Joint Program Office (ITS JPO) has announced that the Systems Engineering Tool for Intelligent Transportation (SET-IT) software is available as available as an Alpha release. SET-IT software integrates drawing and database tools with the CVRIA so that users can develop project architectures for pilots, test beds, and early deployments. The Alpha version of the SET-IT software is provided as-is with the current capabilities of the tool at this point in i
July 14, 2014 Read time: 2 mins
The USDOT's Intelligent Transportation Systems Joint Program Office (ITS JPO) has announced that the Systems Engineering Tool for Intelligent Transportation (SET-IT) software is available as available as an Alpha release.

SET-IT software integrates drawing and database tools with the CVRIA so that users can develop project architectures for pilots, test beds, and early deployments.
 
The Alpha version of the SET-IT software is provided as-is with the current capabilities of the tool at this point in its development. Future versions will include additional functionality such as an enterprise view, a communications view, correspondence between views, more output, hierarchical models, etc. Microsoft (MS) Visio 2010 or 2013 (32-bit) is required to use this tool. To utilise tabular output functions, users must also have a copy of MS Word or MS Excel.
 
The Alpha-version designation indicates that the distribution of the software needs wider testing before being upgraded to a "General Availability" release. User input is essential to this wider testing and release. The USDOT welcomes your comments.

Download SET-IT from the Connected Vehicle Reference Implementation Architecture (CVRIA) %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal website Visit: http://www.iteris.com/cvria/html/resources/tools.html false http://www.iteris.com/cvria/html/resources/tools.html false false%>

Related Content

  • Presentations from 2012 Connected Vehicle Safety Workshop now available online
    October 4, 2012
    PowerPoint presentations from September’s Connected Vehicle public meeting in Chicago are now available for viewing on the internet. The meeting, which was organised by the Intelligent Transportation Systems Joint Program Office (ITS JPO), focused on vehicle-to-vehicle safety, the current safety pilot model deployment, development of a robust vehicle-to-infrastructure environment, connected vehicle deployment strategies, and preparation for NHTSA's 2013 decision. In addition, participants had an opportunit
  • Reflecting on the EU ITS action plan
    January 7, 2013
    How do national policy positions reflect key facets of the European Commission (EC) ITS Action Plan? How useful are memoranda of understanding (MoU) as association tools? How can associations attract more young people to work in ITS? Finding answers to these questions emerged as key challenges for 2013 at the Network of National ITS Association’s November 2012 meeting in Dublin. Commenting on its commitment to work with Ertico-ITS Europe in surveying national action plan stances, Network chair Jennie Mart
  • Kuwait seeks web-based traffic demand management
    July 1, 2013
    The United Nations Development Programme in Kuwait (UNDP) has issued a tender for the development of web-based traffic demand management, road safety and enforcement project for the State of Kuwait. Tender documents and more information are available here. UNDP will arrange site visits to the State of Kuwait traffic control centre, Planning and Research Directorates, training centre, and police patrol operations centre to enable potential suppliers to obtain more information on existing traffic management
  • USDOT Connected Vehicles Pilot Deployment Program webinar
    August 14, 2014
    The Connected Vehicle Pilot Deployment Program Webinar series part 1: Concept, Phases, Waves, and Partnerships, sponsored by the USDOT and hosted by Kate Hartman, the Intelligent Transportation Systems Joint Program Office (ITS JPO) Connected Vehicle Pilots program manager, takes place on 27 August at 2pm-3pm EST. The program seeks to combine connected vehicle and mobile device technologies in innovative and cost-effective ways. Ultimately, this program will improve traveler mobility and system productiv