Skip to main content

All electric vehicle barrier exceeds cycle testing expectations

"The cycle testing was performed at the Texas Transportation Institute at the Texas A&M University System, in College Station, Texas. The IIID electric barrier successfully completed 1,491,455 cycles, before a replaceable cable failed.
March 23, 2012 Read time: 1 min
RSSNasatka Security has announced that its NMSB IIID steel plate vehicle barrier exceeded the expectations of the US Department of State (DOS) active vehicle barrier cycle test specification, by completing nearly 1.5 million up/down cycles of continuous operation between April and September 2011. Under the specification, the barrier was run non-stop, with no allowance for pausing the test for preventative maintenance or inspections.

The cycle testing was performed at the 232 Texas Transportation Institute at the Texas A&M University System, in College Station, Texas. The IIID electric barrier successfully completed 1,491,455 cycles, before a replaceable cable failed.

“Through the use of linear actuators and better system control accommodated with electric servo drive technology, Nasatka's IIID electric barrier ran uninterrupted for what totals over five years of barrier cycles at a high vehicle volume site," said David Natelson, president of Nasatka Security.

Related Content

  • April 16, 2012
    Grant to develop thermoelectric-based energy recovery system for cars
    Amerigon Incorporated has been awarded an US$8 million grant from the US Department of Energy (DOE) to lead the development of an energy recovery system that can improve passenger car fuel efficiency by five per cent by converting waste heat from gas exhaust into electric power using a thermoelectric generator.
  • March 27, 2012
    California to set up statewide BEV charging network
    The US state of California has announced a statewide US$120 million battery electric vehicle (BEV) charging station network to supply 10,000 retrofitted charging systems at areas such as individual offices and homes, along with at least 200 public charging stations. Under the scheme, announced by Governor Jerry Brown, all major California cities are to have the charging infrastructure to be BEV-ready by 2015 with the state having a charging infrastructure that can support one million zero-emission vehicles
  • August 13, 2014
    Chile renews IRD weigh station maintenance contract
    PAT Traffic, International Road Dynamics’ wholly-owned subsidiary in Santiago, Chile has been awarded the renewal of a contract by Direccion Nacional de Vialidad, MOP Chile, for the maintenance and service of IRD-PAT automated truck weigh stations installed by IRD.
  • April 25, 2012
    UK government to fund carbon-cutting truck trials
    Truck operators have been invited to apply for a slice of US$15.34 million provided for industry trials of carbon-cutting trucks by the UK Department for Transport and the Technology Strategy Board. A competition opened yesterday for applications under the ‘Low carbon truck demonstration trial’ which will deliver fleets of low-emission heavy goods vehicles as well as supporting infrastructure such as fuelling stations and electric recharging hubs.