Skip to main content

All electric vehicle barrier exceeds cycle testing expectations

"The cycle testing was performed at the Texas Transportation Institute at the Texas A&M University System, in College Station, Texas. The IIID electric barrier successfully completed 1,491,455 cycles, before a replaceable cable failed.
March 23, 2012 Read time: 1 min
RSSNasatka Security has announced that its NMSB IIID steel plate vehicle barrier exceeded the expectations of the US Department of State (DOS) active vehicle barrier cycle test specification, by completing nearly 1.5 million up/down cycles of continuous operation between April and September 2011. Under the specification, the barrier was run non-stop, with no allowance for pausing the test for preventative maintenance or inspections.

The cycle testing was performed at the 232 Texas Transportation Institute at the Texas A&M University System, in College Station, Texas. The IIID electric barrier successfully completed 1,491,455 cycles, before a replaceable cable failed.

“Through the use of linear actuators and better system control accommodated with electric servo drive technology, Nasatka's IIID electric barrier ran uninterrupted for what totals over five years of barrier cycles at a high vehicle volume site," said David Natelson, president of Nasatka Security.

For more information on companies in this article

Related Content

  • Scottish company produces motor fuel from whisky
    March 2, 2015
    A Scottish company has become the first in the world to produce biofuel capable of powering cars from residues of the whisky industry. Edinburgh-based Celtic Renewables now plans to build a production facility in central Scotland after manufacturing the first samples of bio-butanol from the by-products of whisky fermentation. Celtic Renewables, in partnership with the Ghent-based BioBase Europe Pilot Plant (BBEPP), has produced the first samples of bio-butanol from waste using a process called the acetone-b
  • Mounting benefits of dynamic tolling project
    January 30, 2012
    Wisconsin's four-year HOT lanes pilot project, launched in May 2008, cost US$18.8 million to construct. Halfway into the project, which uses variably priced, or dynamic, tolling to improve highway efficiency, the benefits are mounting. The problem was obvious, and frustrating, to anyone who ever sat in bumper-to-bumper traffic on State Route 167 and watched a lone car whiz by every 20 seconds or so in the carpool lane. But for planners at the Washington State Department of Transportation, the conundrum was
  • Oklahoma opts for IRD’s electronic truck screening system
    June 10, 2016
    In a US$2.59 million contract awarded by the Oklahoma Department of Transportation (ODOT), International Road Dynamics (IRD) is to build, implement, and maintain a new and innovative port-of-entry (POE) electronic screening system (ESS) for commercial vehicles at Interstate-35 northbound in Love County, Oklahoma. This is the fourth such system to be supplied by IRD, as ODOT continues with the deployment of additional systems throughout the State. The system will allow trucks with compliant weight, dimens
  • Stronger leadership on UK road safety is needed
    July 19, 2012
    Recent increases in road fatalities should be a wake-up call for the UK Government to step up and provide stronger leadership on road safety, say members of parliament in a report examining the Government's Strategic Framework for Road Safety.