Skip to main content

All electric vehicle barrier exceeds cycle testing expectations

"The cycle testing was performed at the Texas Transportation Institute at the Texas A&M University System, in College Station, Texas. The IIID electric barrier successfully completed 1,491,455 cycles, before a replaceable cable failed.
March 23, 2012 Read time: 1 min
RSSNasatka Security has announced that its NMSB IIID steel plate vehicle barrier exceeded the expectations of the US Department of State (DOS) active vehicle barrier cycle test specification, by completing nearly 1.5 million up/down cycles of continuous operation between April and September 2011. Under the specification, the barrier was run non-stop, with no allowance for pausing the test for preventative maintenance or inspections.

The cycle testing was performed at the 232 Texas Transportation Institute at the Texas A&M University System, in College Station, Texas. The IIID electric barrier successfully completed 1,491,455 cycles, before a replaceable cable failed.

“Through the use of linear actuators and better system control accommodated with electric servo drive technology, Nasatka's IIID electric barrier ran uninterrupted for what totals over five years of barrier cycles at a high vehicle volume site," said David Natelson, president of Nasatka Security.

Related Content

  • July 16, 2012
    Commercial Vehicle Operations in New Brunswick
    The Province of New Brunswick has prepared a deployment plan for ITS applications for Commercial Vehicle Operations (CVO). The plan, developed by Delcan Corporation, identifies a number of potential ITS/CVO investments and initiatives to be implemented. One of the initiatives is the Motor Carrier Profile (MCP), which has been selected as one of the sample projects for the application of the Project Evaluation Methodology Framework for Canadian ITS.
  • March 2, 2015
    First full-scale Hyperloop test track ‘planned for 2016’
    According to website The Verge, Hyperloop Transportation Technologies (HTT) has secured land for the first full-scale Hyperloop, planned for a 2016 launch in the California model town of Quay Valley. Building off Elon Musk's freely available designs, the crowdfunded company has marked out a five-mile stretch of Quay Valley adjacent to California's Interstate 5 freeway as a place where the innovative transportation system can be deployed. If successful, it would be the first full-size implementation of Musk'
  • September 6, 2017
    Remote remedies help US authorities identify bridge deficiencies
    Every day 185 million vehicles – cars, trucks, school buses, emergency response units - cross one or more of America’s 55,710 'structurally compromised' steel and concrete road bridges, the highest concentration of which are in Iowa (nearly 5,000), Pennsylvania and Oklahoma. Nearly 2,000 of these crossings are located on interstate highways, according to the American Road and Transportation Builders Association's recent analysis of the US Department of Transportation's 2016 National Bridge Inventory.
  • March 17, 2016
    ‘Free’ power for signs, shelters and so much more
    David Crawford looks at the sunny side of the street. Solar power has been relatively slow in entering the transport sector, but a current blossoming of activity bodes well for the large-scale harnessing of an alternative energy that is zero-emission at source and, in practical terms, infinitely renewable. Traffic management and traveller information systems, and actual vehicles, are all emerging as areas for deployment. Meanwhile roads themselves are being viewed as new-style, fossil fuel-free ‘power stati