Skip to main content

Alaska Railroad to get Wabtec PTC

Wabtec is to supply the Alaska Railroad Corporation with positive train control (PTC) equipment and services, including computer-aided dispatch and back office systems. The systems will be installed on the railroad's 525 miles of controlled track, which are used for both freight and regularly scheduled passenger service. Under the contracts, worth US$16.6 million, Wabtec will provide its interoperable electronic train management system (I-ETMS) equipment and installation of all PTC components for 54 loc
April 3, 2014 Read time: 2 mins
6079 Wabtec is to supply the Alaska Railroad Corporation with positive train control (PTC) equipment and services, including computer-aided dispatch and back office systems.  The systems will be installed on the railroad's 525 miles of controlled track, which are used for both freight and regularly scheduled passenger service.

Under the contracts, worth US$16.6 million, Wabtec will provide its interoperable electronic train management system (I-ETMS) equipment and installation of all PTC components for 54 locomotives.  Wabtec's scope of work also includes installation of its train management and dispatch system (TMDS), a computer-aided dispatch system to be used for centralised traffic control and track warrant control for all territories; and integration of I-ETMS with Wabtec's back office system.  The Alaska Railroad system will be fully interoperable with PTC systems being implemented by Class I railroads in the US.

Albert J. Neupaver, Wabtec's chairman and chief executive officer, said:  "PTC continues to be developed and deployed by freight and passenger railroads in the US and this project with Alaska Railroad demonstrates the variety of capabilities we have to assist our customers."

Eileen Reilly, vice president of Advanced Train Control Systems and Technology for Alaska Railroad, said:  "Wabtec understood our needs and delivered the computer-aided dispatch that is the cornerstone of our PTC project.  We look forward to our continued successful relationship as we implement the I-ETMS PTC at the Alaska Railroad."

For more information on companies in this article

Related Content

  • Tolling faces up to unprecedented challenge
    October 9, 2020
    The next five years are likely to see a number of changes – but the tolling industry will be equal to them, thinks the IBTTA’s Bill Cramer. The best minds in the business are on the case…
  • Columbia goes intermodal to support sustainability
    April 10, 2014
    David Crawford on the ups and downs of a Latin metropolis. Medellín, Colombia’s second city and a recognised leader in sustainable transport thinking, is rapidly extending its substantial existing investment in modern mobility. It is deploying both an enhanced integrated traffic management array and the country’s first intermodal public transportation management system. The supplier of both, under separate €9 million (US$12.3 million) contracts, is Spanish engineering company Indra, a major exporter
  • Professional training key to the future of ITS
    May 21, 2012
    A substantial portfolio of resources is available and expanding, to help employers and professionals build essential skills for current and future needs – the ITS Professional Capacity Building Program. Pete Goldin reports. The US Department of Transportation (USDOT) views ITS as key to the future of transportation, as is evident from the department’s ITS Professional Capacity Building (PCB) program. This is a further manifestation of USDOT’s commitment to ITS. The PCB program provides anyone in the transpo
  • Kapsch’s scalable tolling back office accepts mixed feeds
    September 15, 2014
    Arno Klamminger and Wolfgang Fleischer from Kapsch’s ETC Business Unit outline a new back office solution which addresses the ongoing changes in the road user charging sector. The rapidly increasing scale of some Road User Charging (RUC) schemes, both current and proposed, presents systems developers and manufacturers with significant opportunities in terms of product sales. However, it also presents them with significant challenges - and size is but one part – as at regional, national and international lev